Texas Eastern tests directional drilling in Little Missouri crossing
Patrick Becker
Abstract
Patrick Becker
Abstract
This article discusses the replacement of Texas Eastern Gas Pipeline Company's 24-inch War Emergency Pipeline (WEP) crossing the Little Missouri River near Prescott, Arkansas. It was the company's first experience with horizontal directionally drilled river crossing and represented a test case for future river-crossing applications. Initially two methods for pipe installation were considered: conventional dredging and horizontal directional drilling. The most economical method of pipe installation proved to be the horizontal directionally drilled method. The article discusses the installation of this river crossing.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This article discusses the replacement of Texas Eastern Gas Pipeline Company's 24-inch War Emergency Pipeline (WEP) crossing the Little Missouri River near Prescott, Arkansas. It was the company's first experience with horizontal directionally drilled river crossing and represented a test case for future river-crossing applications. Initially two methods for pipe installation were considered: conventional dredging and horizontal directional drilling. The most economical method of pipe installation proved to be the horizontal directionally drilled method. The article discusses the installation of this river crossing.
Key concepts: Directional drilling, Drilling, Dredging, Pipeline (software), Trenchless technology, Pipeline transport, Engineering, Geology