2015Applied Mechanics and MaterialsOpen access

Relevancy of Factors and Mitigation Measures in Controlling Time and Cost Overrun towards Malaysian Environment

Nadzirah Roslan, Noor Yasmin Zainun, Aftab Hameed Memon

Open full text 7 citations

Abstract

Construction projects are facing time and cost overrun globally. Since, this problem occurs due to various factors, hence for achieving successful construction projects, it is very important to control the responsible factors causing time and cost overrun. This study assessed the relevancy for each mitigation measures in relation with causative factors of time and cost overrun in Malaysian construction projects. A total of 56 mitigation measures were identified and correlated with the critical factors of time and cost overrun which were categorized into four phases of project life cycle. Data collection was done by conducting structured interviews amongst the experienced practitioners of the southern regions of Peninsular Malaysia.

Open-access reader

About this research paper

What this paper is about

Construction projects are facing time and cost overrun globally. Since, this problem occurs due to various factors, hence for achieving successful construction projects, it is very important to control the responsible factors causing time and cost overrun. This study assessed the relevancy for each mitigation measures in relation with causative factors of time and cost overrun in Malaysian construction projects. A total of 56 mitigation measures were identified and correlated with the critical factors of time and cost overrun which were categorized into four phases of project life cycle. Data collection was done by conducting structured interviews amongst the experienced practitioners of the southern regions of Peninsular Malaysia.

Why it matters

OpenAlex reports 7 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Construction projects are facing time and cost overrun globally. Since, this problem occurs due to various factors, hence for achieving successful construction projects, it is very important to control the responsible factors causing time and cost overrun. This study assessed the relevancy for each mitigation measures in relation with causative factors of time and cost overrun in Malaysian construction projects. A total of 56 mitigation measures were identified and correlated with the critical factors of time and cost overrun which were categorized into four phases of project life cycle. Data collection was done by conducting structured interviews amongst the experienced practitioners of the southern regions of Peninsular Malaysia.

Key concepts: Cost overrun, Cost control, Control (management), Business, Data collection, Risk analysis (engineering), Operations management, Engineering