1972Highway Research RecordRequires access

SHIRLEY HIGHWAY EXPRESS BUS ON FREEWAY DEMONSTRATION PROJECT

Ronald J. Fisher

Open publisher page 6 citations

Abstract

THIS PAPER DESCRIBES A SERIES OF IMPROVEMENTS THAT HAVE GIVEN BUSES PREFERENTIAL TREATMENT LEADING TO TRAVEL TIME SAVINGS OF 5 TO 30 MINUTES. THESE IMPROVEMENTS HAVE BEEN IMPLEMENTED OVER THE PAST 2 YEARS ALONG A 9-MILE SECTION OF I-95 (SHIRLEY HIGHWAY) LINKING NORTHERN VIRGINIA WITH DOWNTOWN WASHINGTON, D.C. BUS ROUTES EXPERIENCING THESE TIME SAVINGS HAVE GAINED APPROXIMATELY 4,000 MORE RIDERS, MOST OF WHOM HAVE A CHOICE BETWEEN TAKING BUS OR DRIVING AN AUTOMOBILE. OVER HALF OF THE INCREASE HAS OCCURRED IN THE PAST SEVERAL MONTHS FOLLOWING THE OPENING OF THE FULL LENGTH OF EXCLUSIVE ROADWAY FOR BUSES IN THE MEDIAN OF THE SHIRLEY HIGHWAY AND THE IMPLEMENTATION OF EIGHT NEW EXPRESS BUS ROUTES. RESULTS OF TWO TRAVEL SURVEYS IN THE CORRIDOR MADE AT THE BEGINNING AND END OF THIS PERIOD ARE DISCUSSED, AND EARLY INDICATORS OF THE MODAL CHOICE SHIFT ARE DESCRIBED. ADDITIONAL SURVEYS ARE SCHEDULED AT 4- TO 6-MONTH INTERVALS OVER THE NEXT FEW YEARS. THE TYPES OF ANALYSIS AND DATA THAT WILL BE AVAILABLE FOR GENERAL USE BY URBAN TRANSPORTATION PLANNERS ARE PRESENTED IN PRELIMINARY FORM. THE COST AND REVENUE ASSOCIATED WITH THE INCREASE COMMUTER TRAFFIC IS ANALYZED USING A FIVE-PARAMETER COST ALLOCATION PROCEDURE TO PROVIDE PRELIMINARY GUIDELINES FOR THE FINANCIAL REQUIREMENTS OF SIMILAR IMPROVEMENTS DESIGNED TO ATTRACT MORE COMMUTERS TO BUS SERVICE.

About this research paper

What this paper is about

THIS PAPER DESCRIBES A SERIES OF IMPROVEMENTS THAT HAVE GIVEN BUSES PREFERENTIAL TREATMENT LEADING TO TRAVEL TIME SAVINGS OF 5 TO 30 MINUTES. THESE IMPROVEMENTS HAVE BEEN IMPLEMENTED OVER THE PAST 2 YEARS ALONG A 9-MILE SECTION OF I-95 (SHIRLEY HIGHWAY) LINKING NORTHERN VIRGINIA WITH DOWNTOWN WASHINGTON, D.C. BUS ROUTES EXPERIENCING THESE TIME SAVINGS HAVE GAINED APPROXIMATELY 4,000 MORE RIDERS, MOST OF WHOM HAVE A CHOICE BETWEEN TAKING BUS OR DRIVING AN AUTOMOBILE. OVER HALF OF THE INCREASE HAS OCCURRED IN THE PAST SEVERAL MONTHS FOLLOWING THE OPENING OF THE FULL LENGTH OF EXCLUSIVE ROADWAY FOR BUSES IN THE MEDIAN OF THE SHIRLEY HIGHWAY AND THE IMPLEMENTATION OF EIGHT NEW EXPRESS BUS ROUTES. RESULTS OF TWO TRAVEL SURVEYS IN THE CORRIDOR MADE AT THE BEGINNING AND END OF THIS PERIOD ARE DISCUSSED, AND EARLY INDICATORS OF THE MODAL CHOICE SHIFT ARE DESCRIBED. ADDITIONAL SURVEYS ARE SCHEDULED AT 4- TO 6-MONTH INTERVALS OVER THE NEXT FEW YEARS. THE TYPES OF ANALYSIS AND DATA THAT WILL BE AVAILABLE FOR GENERAL USE BY URBAN TRANSPORTATION PLANNERS ARE PRESENTED IN PRELIMINARY FORM. THE COST AND REVENUE ASSOCIATED WITH THE INCREASE COMMUTER TRAFFIC IS ANALYZED USING A FIVE-PARAMETER COST ALLOCATION PROCEDURE TO PROVIDE PRELIMINARY GUIDELINES FOR THE FINANCIAL REQUIREMENTS OF SIMILAR IMPROVEMENTS DESIGNED TO ATTRACT MORE COMMUTERS TO BUS SERVICE.

Why it matters

OpenAlex reports 6 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

THIS PAPER DESCRIBES A SERIES OF IMPROVEMENTS THAT HAVE GIVEN BUSES PREFERENTIAL TREATMENT LEADING TO TRAVEL TIME SAVINGS OF 5 TO 30 MINUTES. THESE IMPROVEMENTS HAVE BEEN IMPLEMENTED OVER THE PAST 2 YEARS ALONG A 9-MILE SECTION OF I-95 (SHIRLEY HIGHWAY) LINKING NORTHERN VIRGINIA WITH DOWNTOWN WASHINGTON, D.C. BUS ROUTES EXPERIENCING THESE TIME SAVINGS HAVE GAINED APPROXIMATELY 4,000 MORE RIDERS, MOST OF WHOM HAVE A CHOICE BETWEEN TAKING BUS OR DRIVING AN AUTOMOBILE. OVER HALF OF THE INCREASE HAS OCCURRED IN THE PAST SEVERAL MONTHS FOLLOWING THE OPENING OF THE FULL LENGTH OF EXCLUSIVE ROADWAY FOR BUSES IN THE MEDIAN OF THE SHIRLEY HIGHWAY AND THE IMPLEMENTATION OF EIGHT NEW EXPRESS BUS ROUTES. RESULTS OF TWO TRAVEL SURVEYS IN THE CORRIDOR MADE AT THE BEGINNING AND END OF THIS PERIOD ARE DISCUSSED, AND EARLY INDICATORS OF THE MODAL CHOICE SHIFT ARE DESCRIBED. ADDITIONAL SURVEYS ARE SCHEDULED AT 4- TO 6-MONTH INTERVALS OVER THE NEXT FEW YEARS. THE TYPES OF ANALYSIS AND DATA THAT WILL BE AVAILABLE FOR GENERAL USE BY URBAN TRANSPORTATION PLANNERS ARE PRESENTED IN PRELIMINARY FORM. THE COST AND REVENUE ASSOCIATED WITH THE INCREASE COMMUTER TRAFFIC IS ANALYZED USING A FIVE-PARAMETER COST ALLOCATION PROCEDURE TO PROVIDE PRELIMINARY GUIDELINES FOR THE FINANCIAL REQUIREMENTS OF SIMILAR IMPROVEMENTS DESIGNED TO ATTRACT MORE COMMUTERS TO BUS SERVICE.

Key concepts: Transport engineering, Revenue, Downtown, Mile, Engineering, Service (business), Travel time, Level of service

Related papers

Back to paper searchBrowse research topicsOriginal source
SHIRLEY HIGHWAY EXPRESS BUS ON FREEWAY DEMONSTRATION PROJECT — Research Paper | ScholarLens