1975Special report - Transportation Research Board, National Research CouncilRequires access

GETTING THE MOST OUT OF A FREEWAY SYSTEM

A C Estep, Karl Moskowitz

Open publisher page 1 citations

Abstract

Responsibility for the operations, operational analysis, and planning of operational improvements of the California state highway system lies with the Department of Transportation. These three activities are defined, and their application in a program to upgrade and control the Los Angeles freeway network is discussed. Methods of controlling freeway traffic (ramp metering, freeway widening, new construction) are described.

About this research paper

What this paper is about

Responsibility for the operations, operational analysis, and planning of operational improvements of the California state highway system lies with the Department of Transportation. These three activities are defined, and their application in a program to upgrade and control the Los Angeles freeway network is discussed. Methods of controlling freeway traffic (ramp metering, freeway widening, new construction) are described.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Responsibility for the operations, operational analysis, and planning of operational improvements of the California state highway system lies with the Department of Transportation. These three activities are defined, and their application in a program to upgrade and control the Los Angeles freeway network is discussed. Methods of controlling freeway traffic (ramp metering, freeway widening, new construction) are described.

Key concepts: Upgrade, Transport engineering, State highway, Metering mode, Highway system, State (computer science), Control (management), Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
GETTING THE MOST OUT OF A FREEWAY SYSTEM — Research Paper | ScholarLens