2000Hydro 2000: Interactive Hydrology; ProceedingsRequires access

Reusing Stormwater at Homebush Bay

Andrzej Listowski, BC Phillips, P R Steele

Open publisher page 0 citations

Abstract

Upon completion of the planning and establishment of water cycle infrastructure facilities at the Olympic site at Homebush Bay, the Olympic Coordination Authority (OCA) identified a need to refine the hture management and operations of water cycle infrastructure. This included the operation of irrigation reticulation systems and stormwater treatment facilities including the Hill Road Corridor ponds and wetlands, the Northern Water Feature and the Eastern WQCP and the proposed balance stormwater storage located within the Brickpit. Two of the issues of concern were the water resources available for irrigation and the need to establish the feasibility or otherwise of the direct reuse of stormwater, inter-storage transfers of stormwater and the demands for reclaimed water for irrigation purposes. Reclaimed water is sourced primarily from sewage effluent (70%) and is supplemented by stormwater (30%). The investigation of these issues of concern is outlined including the analyses of the various stormwater catchments, storages, transfers and interactions with the Water Reclamation and Management Scheme (WRAMS). It is concluded that stormwater is a key element of the water cycle at Homebush Bay and that stormwater runoff is a valuable resource for both irrigation and reclamation. Based on reviews of the mandatory requirements, operational constraints, functional priorities and modelling of a range of alternative scenarios, protocols have been recommended for all stormwater facilities in the Core District and the Hill Road corridor.

About this research paper

What this paper is about

Upon completion of the planning and establishment of water cycle infrastructure facilities at the Olympic site at Homebush Bay, the Olympic Coordination Authority (OCA) identified a need to refine the hture management and operations of water cycle infrastructure. This included the operation of irrigation reticulation systems and stormwater treatment facilities including the Hill Road Corridor ponds and wetlands, the Northern Water Feature and the Eastern WQCP and the proposed balance stormwater storage located within the Brickpit. Two of the issues of concern were the water resources available for irrigation and the need to establish the feasibility or otherwise of the direct reuse of stormwater, inter-storage transfers of stormwater and the demands for reclaimed water for irrigation purposes. Reclaimed water is sourced primarily from sewage effluent (70%) and is supplemented by stormwater (30%). The investigation of these issues of concern is outlined including the analyses of the various stormwater catchments, storages, transfers and interactions with the Water Reclamation and Management Scheme (WRAMS). It is concluded that stormwater is a key element of the water cycle at Homebush Bay and that stormwater runoff is a valuable resource for both irrigation and reclamation. Based on reviews of the mandatory requirements, operational constraints, functional priorities and modelling of a range of alternative scenarios, protocols have been recommended for all stormwater facilities in the Core District and the Hill Road corridor.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Upon completion of the planning and establishment of water cycle infrastructure facilities at the Olympic site at Homebush Bay, the Olympic Coordination Authority (OCA) identified a need to refine the hture management and operations of water cycle infrastructure. This included the operation of irrigation reticulation systems and stormwater treatment facilities including the Hill Road Corridor ponds and wetlands, the Northern Water Feature and the Eastern WQCP and the proposed balance stormwater storage located within the Brickpit. Two of the issues of concern were the water resources available for irrigation and the need to establish the feasibility or otherwise of the direct reuse of stormwater, inter-storage transfers of stormwater and the demands for reclaimed water for irrigation purposes. Reclaimed water is sourced primarily from sewage effluent (70%) and is supplemented by stormwater (30%). The investigation of these issues of concern is outlined including the analyses of the various stormwater catchments, storages, transfers and interactions with the Water Reclamation and Management Scheme (WRAMS). It is concluded that stormwater is a key element of the water cycle at Homebush Bay and that stormwater runoff is a valuable resource for both irrigation and reclamation. Based on reviews of the mandatory requirements, operational constraints, functional priorities and modelling of a range of alternative scenarios, protocols have been recommended for all stormwater facilities in the Core District and the Hill Road corridor.

Key concepts: Stormwater, Environmental science, Surface runoff, Water resource management, Reclaimed water, Land reclamation, Retention basin, Irrigation