1985Energy Technol. (Wash., D.C.); (United States)Requires access

Cogeneration road: what lies ahead for the electric utilities

Brett Ross

Open publisher page 0 citations

Abstract

Cogeneration, whether utility or non-utility owned, may represent an economically viable and valuable energy and generating capacity resource. Some utilities may find it difficult or impossible for cogeneration to make a meaningful contribution. In either case, the safety, economic, technical and reliability aspects of cogeneration ventures must be subjected to realistic evaluation by utilities, users, and regulators. Service to and possible participation in Public Utility Regulatory Policies Act (PURPA) qualifying facility ventures will offer both opportunities and challenges in the 1980s and 90s. Utility personnel and management must develop a strong background in all aspects in order to develop a flexible, informed, and innovative approach.

About this research paper

What this paper is about

Cogeneration, whether utility or non-utility owned, may represent an economically viable and valuable energy and generating capacity resource. Some utilities may find it difficult or impossible for cogeneration to make a meaningful contribution. In either case, the safety, economic, technical and reliability aspects of cogeneration ventures must be subjected to realistic evaluation by utilities, users, and regulators. Service to and possible participation in Public Utility Regulatory Policies Act (PURPA) qualifying facility ventures will offer both opportunities and challenges in the 1980s and 90s. Utility personnel and management must develop a strong background in all aspects in order to develop a flexible, informed, and innovative approach.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Cogeneration, whether utility or non-utility owned, may represent an economically viable and valuable energy and generating capacity resource. Some utilities may find it difficult or impossible for cogeneration to make a meaningful contribution. In either case, the safety, economic, technical and reliability aspects of cogeneration ventures must be subjected to realistic evaluation by utilities, users, and regulators. Service to and possible participation in Public Utility Regulatory Policies Act (PURPA) qualifying facility ventures will offer both opportunities and challenges in the 1980s and 90s. Utility personnel and management must develop a strong background in all aspects in order to develop a flexible, informed, and innovative approach.

Key concepts: Cogeneration, Order (exchange), Service (business), Resource (disambiguation), Risk analysis (engineering), Environmental economics, Business, Reliability (semiconductor)

Related papers

Back to paper searchBrowse research topicsOriginal source
Cogeneration road: what lies ahead for the electric utilities — Research Paper | ScholarLens