1991Transportation Research Record Journal of the Transportation Research BoardRequires access

CABLE-STAYED HOUSTON SHIP CHANNEL CROSSING

Holger Svensson, Thomas G. Lovett

Open publisher page 1 citations

Abstract

The bridge crosses the Houston Ship Channel 20 miles east of Houston between the cities of Baytown and LaPorte, Texas. It is the first dual superstructure cable-stayed bridge, and its total dcek area of about 350,000 sq ft makes it one of the largest cable-stayed bridges to date. Each of the dual cable-stayed bridges has a composite superstructure girder with a main span of 1250 ft and a navigational clearance of 175 ft. The twin concrete towers with a double diamond shape configuration rise 426 ft above the ground. In the transverse direction they carry the loads by truss action, in the longitudinal direction they are fixed to the foundations and elastically supported by the stay cables. Each of the two girders is 78 ft 2 in. wide and consists of a 5 ft 3 in. deep steel grid. Exterior main edge girders and transverse floor beams at 17 ft spacing are plate girders with an 8 in. composite concrete roadway slab. An additional wearing surface is 4 in. thick. The roadway slab was designed for composite action under dead and live load. The stay cables vary between 19 and 61 strands of 0.6 in. diameter. Their corrosion protection consists of Polyethylene (PE) pipes with cement grout. In addition, they are wrapped with a white weather-resistant tape. Construction started in 1987; completion of the bridge is anticipated in 1992.

About this research paper

What this paper is about

The bridge crosses the Houston Ship Channel 20 miles east of Houston between the cities of Baytown and LaPorte, Texas. It is the first dual superstructure cable-stayed bridge, and its total dcek area of about 350,000 sq ft makes it one of the largest cable-stayed bridges to date. Each of the dual cable-stayed bridges has a composite superstructure girder with a main span of 1250 ft and a navigational clearance of 175 ft. The twin concrete towers with a double diamond shape configuration rise 426 ft above the ground. In the transverse direction they carry the loads by truss action, in the longitudinal direction they are fixed to the foundations and elastically supported by the stay cables. Each of the two girders is 78 ft 2 in. wide and consists of a 5 ft 3 in. deep steel grid. Exterior main edge girders and transverse floor beams at 17 ft spacing are plate girders with an 8 in. composite concrete roadway slab. An additional wearing surface is 4 in. thick. The roadway slab was designed for composite action under dead and live load. The stay cables vary between 19 and 61 strands of 0.6 in. diameter. Their corrosion protection consists of Polyethylene (PE) pipes with cement grout. In addition, they are wrapped with a white weather-resistant tape. Construction started in 1987; completion of the bridge is anticipated in 1992.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The bridge crosses the Houston Ship Channel 20 miles east of Houston between the cities of Baytown and LaPorte, Texas. It is the first dual superstructure cable-stayed bridge, and its total dcek area of about 350,000 sq ft makes it one of the largest cable-stayed bridges to date. Each of the dual cable-stayed bridges has a composite superstructure girder with a main span of 1250 ft and a navigational clearance of 175 ft. The twin concrete towers with a double diamond shape configuration rise 426 ft above the ground. In the transverse direction they carry the loads by truss action, in the longitudinal direction they are fixed to the foundations and elastically supported by the stay cables. Each of the two girders is 78 ft 2 in. wide and consists of a 5 ft 3 in. deep steel grid. Exterior main edge girders and transverse floor beams at 17 ft spacing are plate girders with an 8 in. composite concrete roadway slab. An additional wearing surface is 4 in. thick. The roadway slab was designed for composite action under dead and live load. The stay cables vary between 19 and 61 strands of 0.6 in. diameter. Their corrosion protection consists of Polyethylene (PE) pipes with cement grout. In addition, they are wrapped with a white weather-resistant tape. Construction started in 1987; completion of the bridge is anticipated in 1992.

Key concepts: Girder, Structural engineering, Truss, Engineering, Span (engineering), Grout, Slab, Deck

Related papers

Back to paper searchBrowse research topicsOriginal source
CABLE-STAYED HOUSTON SHIP CHANNEL CROSSING — Research Paper | ScholarLens