Brazilian field to be waterflooded from the beginning
Admilson T. Franco
Abstract
Admilson T. Franco
Abstract
Oil production and water injection will start simultaneously when Petrobras begins exploiting a new Brazilian offshore field later in the year. The pool is Guaricema, a 1968 discovery, located 10 miles off Aracaju, Sergipe. It is one of 2 offshore structures currently under development by Petrobras. The other is Ciaoba, where in-field drilling began earlier this year from a 12-well platform. While waterflooding from the outset is the technical high-light of the new operation, Guaricema's production facilities stand out for 2 other reasons: (1) no pumping equipment will be used to gather the oil or transfer it to shore--a network of 2-phase lines will allow Petrobras to fully utilize the energy of expanding solution gas; and (2) the small field (its potential is now estimated at 12,000 to 15,000 bpd) will boast 4 small, fixed platforms, rather than a single, large one. This multistructure approach was necessary, due to the long, narrow shape of the field and its relatively thin (18-ft average) shallow pay, lying at little over 3,000 ft deep. The entire system has provisions for drilling 20 wells--16 for oil and 4 for water injection. A schematic drawing shows the entire system, while plan drawings show detailed viewsmore » of the unusual production system for each platform and the onshore terminal.« less
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Oil production and water injection will start simultaneously when Petrobras begins exploiting a new Brazilian offshore field later in the year. The pool is Guaricema, a 1968 discovery, located 10 miles off Aracaju, Sergipe. It is one of 2 offshore structures currently under development by Petrobras. The other is Ciaoba, where in-field drilling began earlier this year from a 12-well platform. While waterflooding from the outset is the technical high-light of the new operation, Guaricema's production facilities stand out for 2 other reasons: (1) no pumping equipment will be used to gather the oil or transfer it to shore--a network of 2-phase lines will allow Petrobras to fully utilize the energy of expanding solution gas; and (2) the small field (its potential is now estimated at 12,000 to 15,000 bpd) will boast 4 small, fixed platforms, rather than a single, large one. This multistructure approach was necessary, due to the long, narrow shape of the field and its relatively thin (18-ft average) shallow pay, lying at little over 3,000 ft deep. The entire system has provisions for drilling 20 wells--16 for oil and 4 for water injection. A schematic drawing shows the entire system, while plan drawings show detailed viewsmore » of the unusual production system for each platform and the onshore terminal.« less
Key concepts: Submarine pipeline, Petroleum engineering, Completion (oil and gas wells), Oil field, Petroleum, Natural gas field, Drilling, Workover