EFFECT OF TRAFFIC IMPROVEMENTS ON OPERATION OF AN URBAN ARTERIAL STREET
Edmund A Hodgkins
Abstract
Edmund A Hodgkins
Abstract
METHODS WERE EVALUATED TO INCREASE THE TRAFFIC CARRYING CAPABILITY OF IMPROVED ARTERIAL STREETS. ESSENTIALLY, THE IMPROVEMENTS CONSISTED OF THE REMOVAL OF STREETCAR AND LOADING PLATFORMS, NEW PARKING AND TURN REGULATIONS, AND CHANGES IN THE TIMING OF SIGNALS. RESULTS OF BEFORE AND AFTER STUDIES INDICATED THAT (1) OVER-ALL PEAK HOUR VOLUMES FOR FOUR SECTIONS INCREASED 11%, 27%, 11%, AND 9% RESPECTIVELY, (2) THE GENERAL TREND WAS TOWARD A SMALL INCREASE IN PERCENT LOADED CYCLE TIME, (3) THE AVERAGE SPEED FOR ALL RUNS INCREASED FROM 17.8 MPH TO 19.2 MPH, (4) RUNNING SPEEDS INCREASED FROM AN AVERAGE OF 21.8 MPH TO 22.8 MPH, (5) THE CAPACITIES OF THE FOUR SECTIONS ALSO INCREASED.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
METHODS WERE EVALUATED TO INCREASE THE TRAFFIC CARRYING CAPABILITY OF IMPROVED ARTERIAL STREETS. ESSENTIALLY, THE IMPROVEMENTS CONSISTED OF THE REMOVAL OF STREETCAR AND LOADING PLATFORMS, NEW PARKING AND TURN REGULATIONS, AND CHANGES IN THE TIMING OF SIGNALS. RESULTS OF BEFORE AND AFTER STUDIES INDICATED THAT (1) OVER-ALL PEAK HOUR VOLUMES FOR FOUR SECTIONS INCREASED 11%, 27%, 11%, AND 9% RESPECTIVELY, (2) THE GENERAL TREND WAS TOWARD A SMALL INCREASE IN PERCENT LOADED CYCLE TIME, (3) THE AVERAGE SPEED FOR ALL RUNS INCREASED FROM 17.8 MPH TO 19.2 MPH, (4) RUNNING SPEEDS INCREASED FROM AN AVERAGE OF 21.8 MPH TO 22.8 MPH, (5) THE CAPACITIES OF THE FOUR SECTIONS ALSO INCREASED.
Key concepts: Transport engineering, Poison control, Environmental science, Engineering, Forensic engineering, Medicine, Emergency medicine