RAMP CONTROL TO RELIEVE FREEWAY CONGESTION CAUSED BY TRAFFIC DISTURBANCES
Harold J. Payne, William S. Meisel, M D Teener
Abstract
Harold J. Payne, William S. Meisel, M D Teener
Abstract
SYSTEMS HAVE BEEN INSTALLED IN SEVERAL CITIES IN THE UNITED STATES, INCLUDING LOS ANGELES, WHICH ALLOW THE CONTROL OF RAMP SIGNAL LIGHTS FROM A CENTRAL LOCATION. TIME-OF-DAY RAMP VOLUME SCHEDULES HAVE BEEN USED WITH SOME SUCCESS. THIS PAPER EXAMINES A CLASS OF TRAFFIC-RESPONSIVE RAMP CONTROL ALGORITHMS FOR ADJUSTING RAMP VOLUMES IN RESPONSE TO TRAFFIC DISTURBANCES, E.G., CONGESTION RESULTING FROM LANE BLOCKAGES. A LARGE NUMBER OF TRAFFIC-RESPONSIVE RAMP CONTROL PLANS ARE CONSIDERED. EACH PLAN IS EVALUATED IN TERMS OF FREEWAY SERVICE (VEHICLE-MILES) AND DELAY (VEHICLE-HOURS) OVER A FIXED CONTROL PERIOD BY SIMULATING THE RESPONSE OF TRAFFIC TO A LANE BLOCKAGE ON A MACROSCOPIC MODEL OF FREEWAY TRAFFIC. THE RESULT OF THE ANALYSIS IS A SET OF RAMP CONTROL PLANS, EACH OF WHICH YIELDS MINIMUM DELAY FOR A SPECIFIED LEVEL OF FREEWAY SERVICE. THE PERFORMANCE MEASURES ASSOCIATED WITH THESE PLANS ARE PLOTTED AGAINST ONE ANOTHER, YIELDING A TRADE-OFF CURVE FOR FINAL SELECTION OF A RAMP METERING PLAN.
OpenAlex reports 15 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
SYSTEMS HAVE BEEN INSTALLED IN SEVERAL CITIES IN THE UNITED STATES, INCLUDING LOS ANGELES, WHICH ALLOW THE CONTROL OF RAMP SIGNAL LIGHTS FROM A CENTRAL LOCATION. TIME-OF-DAY RAMP VOLUME SCHEDULES HAVE BEEN USED WITH SOME SUCCESS. THIS PAPER EXAMINES A CLASS OF TRAFFIC-RESPONSIVE RAMP CONTROL ALGORITHMS FOR ADJUSTING RAMP VOLUMES IN RESPONSE TO TRAFFIC DISTURBANCES, E.G., CONGESTION RESULTING FROM LANE BLOCKAGES. A LARGE NUMBER OF TRAFFIC-RESPONSIVE RAMP CONTROL PLANS ARE CONSIDERED. EACH PLAN IS EVALUATED IN TERMS OF FREEWAY SERVICE (VEHICLE-MILES) AND DELAY (VEHICLE-HOURS) OVER A FIXED CONTROL PERIOD BY SIMULATING THE RESPONSE OF TRAFFIC TO A LANE BLOCKAGE ON A MACROSCOPIC MODEL OF FREEWAY TRAFFIC. THE RESULT OF THE ANALYSIS IS A SET OF RAMP CONTROL PLANS, EACH OF WHICH YIELDS MINIMUM DELAY FOR A SPECIFIED LEVEL OF FREEWAY SERVICE. THE PERFORMANCE MEASURES ASSOCIATED WITH THESE PLANS ARE PLOTTED AGAINST ONE ANOTHER, YIELDING A TRADE-OFF CURVE FOR FINAL SELECTION OF A RAMP METERING PLAN.
Key concepts: Metering mode, Transport engineering, Traffic congestion, Control (management), Traffic volume, Level of service, Computer science, Engineering