2008•Kyushu University Institutional Repository (QIR) (Kyushu University)Open access

THE EFFECT OF CURING PERIOD ON THE DURABILITY OF CONCRETE USING BLAST-FURNACE SLAG BLENDED CEMENT

Takeshi Iyoda, Yasuhiro Dan, Yasutaka Sagawa, H. Hamada

Open full text 5 citations

Abstract

It is necessary for enwing the required performance of concrete structure, such as the strength and durability, by sufficient curing of concrete. Researchers focused mainly on only compressive strength, not durability. Besides, in most of their research, they used Ordinary Portland Cement (OPC), not blended cement. It is necessary to define the relationship between curing condition and concrete durability using OPC and blended cement. In this research, the effect on concrete durability of different curing conditions and periods of concrete using OPC and Blast-furnace slag cement type B(BB) were investigated. As a result, BB concrete durability is more sensitive to curing condition than OPC. However BB concrete has necessary for extended curing period of 2 days by OPC concrete for keeping enough durability. Moreover, curing is very important on the covering concrete using Blended cement.

Open-access reader

About this research paper

What this paper is about

It is necessary for enwing the required performance of concrete structure, such as the strength and durability, by sufficient curing of concrete. Researchers focused mainly on only compressive strength, not durability. Besides, in most of their research, they used Ordinary Portland Cement (OPC), not blended cement. It is necessary to define the relationship between curing condition and concrete durability using OPC and blended cement. In this research, the effect on concrete durability of different curing conditions and periods of concrete using OPC and Blast-furnace slag cement type B(BB) were investigated. As a result, BB concrete durability is more sensitive to curing condition than OPC. However BB concrete has necessary for extended curing period of 2 days by OPC concrete for keeping enough durability. Moreover, curing is very important on the covering concrete using Blended cement.

Why it matters

OpenAlex reports 5 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

It is necessary for enwing the required performance of concrete structure, such as the strength and durability, by sufficient curing of concrete. Researchers focused mainly on only compressive strength, not durability. Besides, in most of their research, they used Ordinary Portland Cement (OPC), not blended cement. It is necessary to define the relationship between curing condition and concrete durability using OPC and blended cement. In this research, the effect on concrete durability of different curing conditions and periods of concrete using OPC and Blast-furnace slag cement type B(BB) were investigated. As a result, BB concrete durability is more sensitive to curing condition than OPC. However BB concrete has necessary for extended curing period of 2 days by OPC concrete for keeping enough durability. Moreover, curing is very important on the covering concrete using Blended cement.

Key concepts: Durability, Curing (chemistry), Ground granulated blast-furnace slag, Portland cement, Cement, Compressive strength, Materials science, Composite material

Related papers

Back to paper searchBrowse research topicsOriginal source
THE EFFECT OF CURING PERIOD ON THE DURABILITY OF CONCRETE USING BLAST-FURNACE SLAG BLENDED CEMENT — Research Paper | ScholarLens