Where are we with the current shutdown
J. Coupard, K. Foraz
Abstract
Open-access reader
J. Coupard, K. Foraz
Abstract
Open-access reader
Many conference series have adopted the same The first shutdown of the LHC machine started on the 17th of November 2008. In addition to typical shut-down interventions and the works already foreseen (e.g. phase 1 collimator installation), some additional consolidation work is needed. On top of this, comes the work caused by the 19th September incident and the subsequent tests carried out in November and December. This talk will give an overview of the activities currently planned and the key drivers for overall length of the shutdown, highlighting the critical points.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Many conference series have adopted the same The first shutdown of the LHC machine started on the 17th of November 2008. In addition to typical shut-down interventions and the works already foreseen (e.g. phase 1 collimator installation), some additional consolidation work is needed. On top of this, comes the work caused by the 19th September incident and the subsequent tests carried out in November and December. This talk will give an overview of the activities currently planned and the key drivers for overall length of the shutdown, highlighting the critical points.
Key concepts: Shutdown, Shut down, Work (physics), Key (lock), Aeronautics, Engineering, Computer science, Computer security