CPHS Linac Status at Tsinghua University
Qingzi Xing, Cheng Cheng, Lei Du, Taibin Du, Weiqiang Guan, Xialing Guan, Yu He, Chong Jiang, Jian Li, Xuewu Wang, Huayi Zhang, Shu-xin Zheng
Abstract
Qingzi Xing, Cheng Cheng, Lei Du, Taibin Du, Weiqiang Guan, Xialing Guan, Yu He, Chong Jiang, Jian Li, Xuewu Wang, Huayi Zhang, Shu-xin Zheng
Abstract
We present, in this paper, the operation status of the 3 MeV high current proton Linac for the Compact Pulsed Hadron Source (CPHS) at Tsinghua University. Proton beam with the peak current of 30 mA, pulse length of 100 μs and repetition rate of 50 Hz has been delivered to the Beryllium target to produce the neutron since July 2013. The pulse length will be further increased to 500 μs. The proton beam energy is expected to be enhanced to the designed value of 13 MeV after the Drift Tube Linac is ready in 2015.
OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
We present, in this paper, the operation status of the 3 MeV high current proton Linac for the Compact Pulsed Hadron Source (CPHS) at Tsinghua University. Proton beam with the peak current of 30 mA, pulse length of 100 μs and repetition rate of 50 Hz has been delivered to the Beryllium target to produce the neutron since July 2013. The pulse length will be further increased to 500 μs. The proton beam energy is expected to be enhanced to the designed value of 13 MeV after the Drift Tube Linac is ready in 2015.
Key concepts: Linear particle accelerator, Proton, Beryllium, Beam (structure), Physics, Drift tube, Pulse duration, Nuclear physics