2013Research Journal of Applied Sciences Engineering and TechnologyOpen access

Research on Construction Monitoring Techniques for Cable Replacement of the Cable-Stayed Bridge

Dai Pu, Tang Jishun

Open full text 4 citations

Abstract

Due to various reasons, some cable-stayed bridges require the replacement of part or all stay cables after operating for a period of time. In this study, based on some engineering practices of stay cable replacement, the condition of bridge structure before replacement is analyzed with Finite Element Analysis method for plane member system. The theoretical calculations, cable force measurement, replacement methods and process monitoring for cable replacement are introduced to find out the key technical problems. From the specified bridge monitoring practices, we suggest monitoring cable tension and the main beam alignment during the process of cable replacement, to make sure the cable-stayed bridge reaches its design conditions.

Open-access reader

About this research paper

What this paper is about

Due to various reasons, some cable-stayed bridges require the replacement of part or all stay cables after operating for a period of time. In this study, based on some engineering practices of stay cable replacement, the condition of bridge structure before replacement is analyzed with Finite Element Analysis method for plane member system. The theoretical calculations, cable force measurement, replacement methods and process monitoring for cable replacement are introduced to find out the key technical problems. From the specified bridge monitoring practices, we suggest monitoring cable tension and the main beam alignment during the process of cable replacement, to make sure the cable-stayed bridge reaches its design conditions.

Why it matters

OpenAlex reports 4 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Due to various reasons, some cable-stayed bridges require the replacement of part or all stay cables after operating for a period of time. In this study, based on some engineering practices of stay cable replacement, the condition of bridge structure before replacement is analyzed with Finite Element Analysis method for plane member system. The theoretical calculations, cable force measurement, replacement methods and process monitoring for cable replacement are introduced to find out the key technical problems. From the specified bridge monitoring practices, we suggest monitoring cable tension and the main beam alignment during the process of cable replacement, to make sure the cable-stayed bridge reaches its design conditions.

Key concepts: Bridge (graph theory), Engineering, Structural engineering, Process (computing), Beam (structure), Tension (geology), Computer science, Materials science

Related papers

Back to paper searchBrowse research topicsOriginal source
Research on Construction Monitoring Techniques for Cable Replacement of the Cable-Stayed Bridge — Research Paper | ScholarLens