2009Institutional Repositories DataBase (IRDB)Requires access

DEVELOPMENT OF SPILL CONTROL SYSTEM FOR THE J-PARC SLOW EXTRACTION

A. Kiyomichi, T. Adachi, Shigeru Murasugi, R. Muto, Hidetoshi Nakagawa, J. Odagiri, Katsuya Okamura, Yoshihiro Sato, S. Sawada, Y. Shirakabe, Hirohiko Someya, M. Tomizawa, A. Toyoda, Eiichi Yanaoka, Tomohiro Ichikawa, K. Mochiki, Shouko Onuma

Open publisher page 3 citations

Abstract

J-PARC (Japan Proton Accelerator Research Complex) is a new accelerator facility to produce MW-class high power proton beams at both 3GeV and 50GeV. The Main Ring (MR) of J-PARC can extract beams to the neutrino beam line and the slow extraction beam line for Hadron Experimental Facility. The slow extraction beam is used in various nuclear and particle physics experiments. A flat structure and low ripple noise are required for the spills of the slow extraction. We are developing the spill control system for the slow extraction beam. The spill control system consists of the extraction quadrupole magnets and feedback control device. Here we report their construction status.

About this research paper

What this paper is about

J-PARC (Japan Proton Accelerator Research Complex) is a new accelerator facility to produce MW-class high power proton beams at both 3GeV and 50GeV. The Main Ring (MR) of J-PARC can extract beams to the neutrino beam line and the slow extraction beam line for Hadron Experimental Facility. The slow extraction beam is used in various nuclear and particle physics experiments. A flat structure and low ripple noise are required for the spills of the slow extraction. We are developing the spill control system for the slow extraction beam. The spill control system consists of the extraction quadrupole magnets and feedback control device. Here we report their construction status.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

J-PARC (Japan Proton Accelerator Research Complex) is a new accelerator facility to produce MW-class high power proton beams at both 3GeV and 50GeV. The Main Ring (MR) of J-PARC can extract beams to the neutrino beam line and the slow extraction beam line for Hadron Experimental Facility. The slow extraction beam is used in various nuclear and particle physics experiments. A flat structure and low ripple noise are required for the spills of the slow extraction. We are developing the spill control system for the slow extraction beam. The spill control system consists of the extraction quadrupole magnets and feedback control device. Here we report their construction status.

Key concepts: J-PARC, Extraction (chemistry), Beam (structure), Proton, Neutrino, Physics, Nuclear physics, Particle accelerator

Related papers

Back to paper searchBrowse research topicsOriginal source
DEVELOPMENT OF SPILL CONTROL SYSTEM FOR THE J-PARC SLOW EXTRACTION — Research Paper | ScholarLens