2015Unpublished venueRequires access

Acceleration Length Model of an Eight-Lane Freeway with a Two-Lane Ramp Based on Driving Behavior

Yadan Qiao, Yifeng Wu, Zhongyin Guo, Haifeng Wan

Open publisher page 0 citations

Abstract

The current guidelines in China are mainly based on four-lane freeway, which do not fit eight-lane freeway well. Therefore, this paper researched traffic stream characteristics of the on-ramp region of Zhengyi interchange. As a result, the acceleration lane is divided into three regions—the region marked with entrance markings, the region where lane 1 connected with the inside lane of the ramp and the region where lane 1 connected with the outside lane, among which, the minimum length of merging length is calculated as a non-linear integer programming (NLIP) based on the gap acceptance theory and traffic volume. The trial results of the models above show that the present recommended value of acceleration lane length and cannot meet the vehicles’ merging demand under secondary serve level when the freeway is eight-lane with two-lane ramp.

About this research paper

What this paper is about

The current guidelines in China are mainly based on four-lane freeway, which do not fit eight-lane freeway well. Therefore, this paper researched traffic stream characteristics of the on-ramp region of Zhengyi interchange. As a result, the acceleration lane is divided into three regions—the region marked with entrance markings, the region where lane 1 connected with the inside lane of the ramp and the region where lane 1 connected with the outside lane, among which, the minimum length of merging length is calculated as a non-linear integer programming (NLIP) based on the gap acceptance theory and traffic volume. The trial results of the models above show that the present recommended value of acceleration lane length and cannot meet the vehicles’ merging demand under secondary serve level when the freeway is eight-lane with two-lane ramp.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The current guidelines in China are mainly based on four-lane freeway, which do not fit eight-lane freeway well. Therefore, this paper researched traffic stream characteristics of the on-ramp region of Zhengyi interchange. As a result, the acceleration lane is divided into three regions—the region marked with entrance markings, the region where lane 1 connected with the inside lane of the ramp and the region where lane 1 connected with the outside lane, among which, the minimum length of merging length is calculated as a non-linear integer programming (NLIP) based on the gap acceptance theory and traffic volume. The trial results of the models above show that the present recommended value of acceleration lane length and cannot meet the vehicles’ merging demand under secondary serve level when the freeway is eight-lane with two-lane ramp.

Key concepts: Acceleration, Computer science, Traffic volume, Road traffic, Simulation, Transport engineering, Engineering, Physics

Related papers

Back to paper searchBrowse research topicsOriginal source
Acceleration Length Model of an Eight-Lane Freeway with a Two-Lane Ramp Based on Driving Behavior — Research Paper | ScholarLens