Shielding Production: Essential Step in Production Control
Glenn Ballard, G. Howell
Abstract
Glenn Ballard, G. Howell
Abstract
Effective production control systems are structured around the assignment as the unit of analysis. The quality of work assignments in production units such as construction crews and engineering squads is the key to production control and for determining production unit productivity. Research has revealed that the quality of assignments can be substantially improved by forming and selecting them to meet soundness, sequence, and size criteria. Quality assignments shield production units from work flow uncertainty, enabling those units to improve their own productivity, and also improve the productivity of the production units downstream. The associated reduction in task duration can shorten projects. Further reduction of project duration comes from shortening the buffers previously needed to accommodate flow uncertainty.
OpenAlex reports 511 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Effective production control systems are structured around the assignment as the unit of analysis. The quality of work assignments in production units such as construction crews and engineering squads is the key to production control and for determining production unit productivity. Research has revealed that the quality of assignments can be substantially improved by forming and selecting them to meet soundness, sequence, and size criteria. Quality assignments shield production units from work flow uncertainty, enabling those units to improve their own productivity, and also improve the productivity of the production units downstream. The associated reduction in task duration can shorten projects. Further reduction of project duration comes from shortening the buffers previously needed to accommodate flow uncertainty.
Key concepts: Production (economics), Productivity, Task (project management), Quality (philosophy), Duration (music), Work (physics), Work flow, Control (management)