Combined gas/steam turbine power stations with coal pressure gasification unit operating to the STEAG-Lurgi system

Helmut Meyer-Kahrweg

Open publisher page 0 citations

Abstract

According to West Germany's STEAG, the novel combination of the combined-cycle gas/steam turbine arrangement with a coal pressure-gasification plant will help promote the future use of coal for power-generation purposes with a high degree of efficiency, even under more stringent pollution-control regulations. In 1969, STEAG decided to build such a plant. The KDV plant (Kohledruckvergasungs-Kraftwerk or coal pressure-gasification power station) was installed in existing buildings at the STEAG power station in Luenen, West Germany. Operating experience demonstrated fully the capability of the combined-cycle unit (supercharged boiler, gas turbine, and steam turbine). An extensive R and D program is now under way to develop a second-generation KDV plant of 400-MW capacity. The main objectives of the program are (1) desulfurization of the combustion gas, (9) enlargement of the coal spectrum, (3) increasing of the gasifier capacity, and (4) development of a supercharged steam generator with more than twice the present capacity and with reheat facility. Other advantages will include dust-free waste gases, up to 90% reduction in SO/sub 2/ emissions, about 50% reduction in NO/sub x/ emissions, higher efficiency than a comparable-size coal-fired power station, and 15% lower plant costs than a conventional coal-fired plant equipped with flue-gas desulfurization.

About this research paper

What this paper is about

According to West Germany's STEAG, the novel combination of the combined-cycle gas/steam turbine arrangement with a coal pressure-gasification plant will help promote the future use of coal for power-generation purposes with a high degree of efficiency, even under more stringent pollution-control regulations. In 1969, STEAG decided to build such a plant. The KDV plant (Kohledruckvergasungs-Kraftwerk or coal pressure-gasification power station) was installed in existing buildings at the STEAG power station in Luenen, West Germany. Operating experience demonstrated fully the capability of the combined-cycle unit (supercharged boiler, gas turbine, and steam turbine). An extensive R and D program is now under way to develop a second-generation KDV plant of 400-MW capacity. The main objectives of the program are (1) desulfurization of the combustion gas, (9) enlargement of the coal spectrum, (3) increasing of the gasifier capacity, and (4) development of a supercharged steam generator with more than twice the present capacity and with reheat facility. Other advantages will include dust-free waste gases, up to 90% reduction in SO/sub 2/ emissions, about 50% reduction in NO/sub x/ emissions, higher efficiency than a comparable-size coal-fired power station, and 15% lower plant costs than a conventional coal-fired plant equipped with flue-gas desulfurization.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

According to West Germany's STEAG, the novel combination of the combined-cycle gas/steam turbine arrangement with a coal pressure-gasification plant will help promote the future use of coal for power-generation purposes with a high degree of efficiency, even under more stringent pollution-control regulations. In 1969, STEAG decided to build such a plant. The KDV plant (Kohledruckvergasungs-Kraftwerk or coal pressure-gasification power station) was installed in existing buildings at the STEAG power station in Luenen, West Germany. Operating experience demonstrated fully the capability of the combined-cycle unit (supercharged boiler, gas turbine, and steam turbine). An extensive R and D program is now under way to develop a second-generation KDV plant of 400-MW capacity. The main objectives of the program are (1) desulfurization of the combustion gas, (9) enlargement of the coal spectrum, (3) increasing of the gasifier capacity, and (4) development of a supercharged steam generator with more than twice the present capacity and with reheat facility. Other advantages will include dust-free waste gases, up to 90% reduction in SO/sub 2/ emissions, about 50% reduction in NO/sub x/ emissions, higher efficiency than a comparable-size coal-fired power station, and 15% lower plant costs than a conventional coal-fired plant equipped with flue-gas desulfurization.

Key concepts: Combined cycle, Waste management, Coal, Power station, Flue gas, Steam-electric power station, Boiler (water heating), Steam turbine

Related papers

Back to paper searchBrowse research topicsOriginal source
Combined gas/steam turbine power stations with coal pressure gasification unit operating to the STEAG-Lurgi system — Research Paper | ScholarLens