HELIOS, The Linac Injector of SOLEIL: Installation and First Results
B. Pottin, R. Chaput, J-P. Pollina, M-A. Tordeux, Dominique Jousse, J-L. Pastre, A. Setty
Abstract
B. Pottin, R. Chaput, J-P. Pollina, M-A. Tordeux, Dominique Jousse, J-L. Pastre, A. Setty
Abstract
HELIOS is the Hundred MeV Electron Linac Injector Of SOLEIL [1] the new French SR facility. The Linac is constructed by THALES as a “turn key” equipment on the basis of SOLEIL APD design. The Linac injector is composed of a triode gun (90kV, 500mA), a prebuncher (10kV, 200W), a buncher (SW, 15MeV, 5MW) focalised by a shielded solenoid and two accelerating sections (TW, 2π/3, 45MeV, 12MW) feeded by two klystrons (35MW). The major Linac components have been previously tested at THALES factory and the on-site installation has begun since October 2004. After a brief description of the building construction and the Linac installation, the tests of the different components and operating modes will be detailed. The commissioning with beam was planned in March. But, the official clearance to start the Linac tests arrived in the first week of April. Therefore, the commissioning will take place in June.
OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
HELIOS is the Hundred MeV Electron Linac Injector Of SOLEIL [1] the new French SR facility. The Linac is constructed by THALES as a “turn key” equipment on the basis of SOLEIL APD design. The Linac injector is composed of a triode gun (90kV, 500mA), a prebuncher (10kV, 200W), a buncher (SW, 15MeV, 5MW) focalised by a shielded solenoid and two accelerating sections (TW, 2π/3, 45MeV, 12MW) feeded by two klystrons (35MW). The major Linac components have been previously tested at THALES factory and the on-site installation has begun since October 2004. After a brief description of the building construction and the Linac installation, the tests of the different components and operating modes will be detailed. The commissioning with beam was planned in March. But, the official clearance to start the Linac tests arrived in the first week of April. Therefore, the commissioning will take place in June.
Key concepts: Injector, Linear particle accelerator, Computer science, Computer graphics (images), Engineering, Physics, Mechanical engineering, Optics