2007•Unpublished venueRequires access

Current Results on EDZL Scheduling for Multiprocessor Real-Time Systems

Hsin‐Wen Wei, Yi-Hsiung Chao, Shun‐Shii Lin, Kwei-Jay Lin, Wei‐Kuan Shih

Open publisher page 18 citations

Abstract

Many optimal uniprocessor schedulers, such as earliest deadline first (EDF) and rate monotonic (RM), do not have a good schedulability bound on multiprocessor systems. In this paper, we study an on-line algorithm earliest deadline first until Zero laxity (EDZL) for multiprocessor systems. A set of tasks scheduled by EDZL is scheduled using EDF until a job experiences a zero laxity. To avoid the job from missing its deadline, the priority of the job is immediately promoted to the highest priority. We derive the schedulability bound of 3/2+\umax-1/2\ for two-processor systems, where umaxis the maximum utilization of an individual task in the given task set. We also discuss the best known upper bound and lower bound on EDZL schedulability conditions.

About this research paper

What this paper is about

Many optimal uniprocessor schedulers, such as earliest deadline first (EDF) and rate monotonic (RM), do not have a good schedulability bound on multiprocessor systems. In this paper, we study an on-line algorithm earliest deadline first until Zero laxity (EDZL) for multiprocessor systems. A set of tasks scheduled by EDZL is scheduled using EDF until a job experiences a zero laxity. To avoid the job from missing its deadline, the priority of the job is immediately promoted to the highest priority. We derive the schedulability bound of 3/2+\umax-1/2\ for two-processor systems, where umaxis the maximum utilization of an individual task in the given task set. We also discuss the best known upper bound and lower bound on EDZL schedulability conditions.

Why it matters

OpenAlex reports 18 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Many optimal uniprocessor schedulers, such as earliest deadline first (EDF) and rate monotonic (RM), do not have a good schedulability bound on multiprocessor systems. In this paper, we study an on-line algorithm earliest deadline first until Zero laxity (EDZL) for multiprocessor systems. A set of tasks scheduled by EDZL is scheduled using EDF until a job experiences a zero laxity. To avoid the job from missing its deadline, the priority of the job is immediately promoted to the highest priority. We derive the schedulability bound of 3/2+\umax-1/2\ for two-processor systems, where umaxis the maximum utilization of an individual task in the given task set. We also discuss the best known upper bound and lower bound on EDZL schedulability conditions.

Key concepts: Uniprocessor system, Multiprocessing, Computer science, Scheduling (production processes), Upper and lower bounds, Monotonic function, Parallel computing, Processor scheduling

Related papers

Back to paper searchBrowse research topicsOriginal source
Current Results on EDZL Scheduling for Multiprocessor Real-Time Systems — Research Paper | ScholarLens