1994Quality EngineeringRequires access

DETERMINING THE OPTIMUM SCHEDULE FOR PREVENTIVE MAINTENANCE

Bryan Dodson

Open publisher page 31 citations

Abstract

Each time preventive maintenance is performed on an item a cost is incurred. However, if the item fails before preventive maintenance is performed, the cost associated with the failure is higher than the cost of the preventive maintenance necessary to p..

About this research paper

What this paper is about

Each time preventive maintenance is performed on an item a cost is incurred. However, if the item fails before preventive maintenance is performed, the cost associated with the failure is higher than the cost of the preventive maintenance necessary to p..

Why it matters

OpenAlex reports 31 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Each time preventive maintenance is performed on an item a cost is incurred. However, if the item fails before preventive maintenance is performed, the cost associated with the failure is higher than the cost of the preventive maintenance necessary to p..

Key concepts: Preventive maintenance, Schedule, Reliability engineering, Health maintenance, Predictive maintenance, Planned maintenance, Operations management, Proactive maintenance

Related papers

Back to paper searchBrowse research topicsOriginal source
DETERMINING THE OPTIMUM SCHEDULE FOR PREVENTIVE MAINTENANCE — Research Paper | ScholarLens