DETERMINING THE OPTIMUM SCHEDULE FOR PREVENTIVE MAINTENANCE
Bryan Dodson
Abstract
Bryan Dodson
Abstract
Each time preventive maintenance is performed on an item a cost is incurred. However, if the item fails before preventive maintenance is performed, the cost associated with the failure is higher than the cost of the preventive maintenance necessary to p..
OpenAlex reports 31 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Each time preventive maintenance is performed on an item a cost is incurred. However, if the item fails before preventive maintenance is performed, the cost associated with the failure is higher than the cost of the preventive maintenance necessary to p..
Key concepts: Preventive maintenance, Schedule, Reliability engineering, Health maintenance, Predictive maintenance, Planned maintenance, Operations management, Proactive maintenance