2008Unpublished venueRequires access

Short-Period Aeration Pilot Tests in Wuhan Shahu Wastewater Treatment Plant

Jianhua Jin, Yinghe Jiang, Xiahui Wang

Open publisher page 0 citations

Abstract

Short-period aeration method is to shorten aeration time effectively by reducing the number of running aeration tanks on the basis of traditional activated sludge process. The optimal working condition has been determined by short-period aeration pilot tests in Wuhan Shahu Wastewater Treatment Plant. The results of tests show that the effluents of the secondary sedimentation tanks can meet the sewage discharging standards and a lot of costs can be greatly saved.

About this research paper

What this paper is about

Short-period aeration method is to shorten aeration time effectively by reducing the number of running aeration tanks on the basis of traditional activated sludge process. The optimal working condition has been determined by short-period aeration pilot tests in Wuhan Shahu Wastewater Treatment Plant. The results of tests show that the effluents of the secondary sedimentation tanks can meet the sewage discharging standards and a lot of costs can be greatly saved.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Short-period aeration method is to shorten aeration time effectively by reducing the number of running aeration tanks on the basis of traditional activated sludge process. The optimal working condition has been determined by short-period aeration pilot tests in Wuhan Shahu Wastewater Treatment Plant. The results of tests show that the effluents of the secondary sedimentation tanks can meet the sewage discharging standards and a lot of costs can be greatly saved.

Key concepts: Aeration, Sewage treatment, Effluent, Sedimentation, Activated sludge, Environmental science, Sewage, Wastewater

Related papers

Back to paper searchBrowse research topicsOriginal source
Short-Period Aeration Pilot Tests in Wuhan Shahu Wastewater Treatment Plant — Research Paper | ScholarLens