2014•Concurrent EngineeringRequires access

A model of flow-shop production system planning using multiple criteria and multiple constraint levels ( MC 2 )

Shih-Fang Wong, Yuyong Zhang

Open publisher page 3 citations

Abstract

Scheduling is one of the most important functions in managing industrial production. This article deals with the scheduling for the flow-shop production system planning by presenting a model that uses the framework of multiple criteria and multiple constraint levels ([Formula: see text]) linear programming, aiming at advancing the adaptation of the model to the situation when there are more than one decision makers in the system. At first, a flow-shop production system planning model with multiple constraint levels is proposed considering fluctuation in resource constraints such as the investment constraint and time constraint. Then, an improved algorithm is proposed. Finally, an example about production scheduling of an actual production is given, and the computational results are presented.

About this research paper

What this paper is about

Scheduling is one of the most important functions in managing industrial production. This article deals with the scheduling for the flow-shop production system planning by presenting a model that uses the framework of multiple criteria and multiple constraint levels ([Formula: see text]) linear programming, aiming at advancing the adaptation of the model to the situation when there are more than one decision makers in the system. At first, a flow-shop production system planning model with multiple constraint levels is proposed considering fluctuation in resource constraints such as the investment constraint and time constraint. Then, an improved algorithm is proposed. Finally, an example about production scheduling of an actual production is given, and the computational results are presented.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Scheduling is one of the most important functions in managing industrial production. This article deals with the scheduling for the flow-shop production system planning by presenting a model that uses the framework of multiple criteria and multiple constraint levels ([Formula: see text]) linear programming, aiming at advancing the adaptation of the model to the situation when there are more than one decision makers in the system. At first, a flow-shop production system planning model with multiple constraint levels is proposed considering fluctuation in resource constraints such as the investment constraint and time constraint. Then, an improved algorithm is proposed. Finally, an example about production scheduling of an actual production is given, and the computational results are presented.

Key concepts: Scheduling (production processes), Production planning, Constraint (computer-aided design), Flow shop scheduling, Mathematical optimization, Computer science, Production (economics), Constraint programming

Related papers

Back to paper searchBrowse research topicsOriginal source
A model of flow-shop production system planning using multiple criteria and multiple constraint levels ( MC 2 ) — Research Paper | ScholarLens