2001•SIAM Journal on Control and OptimizationOpen access

A Dynamic Programming Algorithm for the Optimal Control of Piecewise Deterministic Markov Processes

Anthony Almudevar

Open full text 39 citations

Abstract

A piecewise deterministic Markov process (PDP) is a continuous time Markov process consisting of continuous, deterministic trajectories interrupted by random jumps. The trajectories may be controlled with the object of minimizing the expected costs associated with the process. A method of representing this controlled PDP as a discrete time decision process is presented, allowing the value function for the problem to be expressed as the fixed point of a dynamic programming operator. Decisions take the form of trajectory segments. The expected costs may then be minimized through a dynamic programming algorithm, rather than through the solution of the Bellman--Hamilton--Jacobi equation, assuming the trajectory segments are numerically tractable. The technique is applied to the optimal capacity expansion problem, that is, the problem of planning the construction of new production facilities to meet rising demand.

Open-access reader

About this research paper

What this paper is about

A piecewise deterministic Markov process (PDP) is a continuous time Markov process consisting of continuous, deterministic trajectories interrupted by random jumps. The trajectories may be controlled with the object of minimizing the expected costs associated with the process. A method of representing this controlled PDP as a discrete time decision process is presented, allowing the value function for the problem to be expressed as the fixed point of a dynamic programming operator. Decisions take the form of trajectory segments. The expected costs may then be minimized through a dynamic programming algorithm, rather than through the solution of the Bellman--Hamilton--Jacobi equation, assuming the trajectory segments are numerically tractable. The technique is applied to the optimal capacity expansion problem, that is, the problem of planning the construction of new production facilities to meet rising demand.

Why it matters

OpenAlex reports 39 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A piecewise deterministic Markov process (PDP) is a continuous time Markov process consisting of continuous, deterministic trajectories interrupted by random jumps. The trajectories may be controlled with the object of minimizing the expected costs associated with the process. A method of representing this controlled PDP as a discrete time decision process is presented, allowing the value function for the problem to be expressed as the fixed point of a dynamic programming operator. Decisions take the form of trajectory segments. The expected costs may then be minimized through a dynamic programming algorithm, rather than through the solution of the Bellman--Hamilton--Jacobi equation, assuming the trajectory segments are numerically tractable. The technique is applied to the optimal capacity expansion problem, that is, the problem of planning the construction of new production facilities to meet rising demand.

Key concepts: Dynamic programming, Markov decision process, Mathematical optimization, Bellman equation, Piecewise, Mathematics, Markov process, Trajectory

Related papers

Back to paper searchBrowse research topicsOriginal source
A Dynamic Programming Algorithm for the Optimal Control of Piecewise Deterministic Markov Processes — Research Paper | ScholarLens