A diagnostic analysis of the impact of forecast errors on production planning via MRP system nervousness
Chrwan‐Jyh Ho, Tim C. Ireland
Abstract
Chrwan‐Jyh Ho, Tim C. Ireland
Abstract
. The purpose of this paper is to examine the impact of forecast errors on the performance of a multi-product, multilevel production planning system via MRP system nervousness. The accuracy of forecasting methods was at one time a major concern of production scheduling and inventory control. However, with the advent of material requirements planning (MRP) systems, the significance of selecting an accurate forecasting method has diminished. Inaccurate forecast results are taken as a fact of life in production planning. Instead of attempting to develop an accurate forecasting method, efforts have been devoted towards providing an appropriate buffering method ai the master production schedule level or on the shop floor level to counteract fluctuations in demand. MRP is capable of rescheduling planned orders as well as open orders to restore the priority integrity after the disruptive changes of forecast errors occur. Nevertheless, excessive rescheduling may lead to a problem, generally referred to as system nervousness. This study investigates this problem by means of a computer simulation model. The results show that the presence of forecasi
OpenAlex reports 16 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
. The purpose of this paper is to examine the impact of forecast errors on the performance of a multi-product, multilevel production planning system via MRP system nervousness. The accuracy of forecasting methods was at one time a major concern of production scheduling and inventory control. However, with the advent of material requirements planning (MRP) systems, the significance of selecting an accurate forecasting method has diminished. Inaccurate forecast results are taken as a fact of life in production planning. Instead of attempting to develop an accurate forecasting method, efforts have been devoted towards providing an appropriate buffering method ai the master production schedule level or on the shop floor level to counteract fluctuations in demand. MRP is capable of rescheduling planned orders as well as open orders to restore the priority integrity after the disruptive changes of forecast errors occur. Nevertheless, excessive rescheduling may lead to a problem, generally referred to as system nervousness. This study investigates this problem by means of a computer simulation model. The results show that the presence of forecasi
Key concepts: Material requirements planning, Production planning, Production (economics), Scheduling (production processes), Operations research, Production schedule, Schedule, Lead time