1973•Journal of the Construction DivisionRequires access

Railroad Crossings at Berwick Bay

Thomas E. Petermann

Open publisher page 1 citations

Abstract

Modifications are made to a main-line single track railroad draw bridge across a much used wateway connecting the industrial Gulf Coast with the areas served by the Mississippi River. The outmoded draw bridge was a deterrent to the safe passage of vessels using this waterway. Two existing trusses near the center of the crossing are replaced by a 370-ft (113-m) vertical lift span to provide better alignment and greater width to the navigation channel through the bridge. The remains of an earlier bridge near this site required the extraction of old timber pile tips from a water depth of 70 ft (21 m). Numerous collisions to the structure by tows hampered the new construction and emphasized the need for improvements made to the structure. The change-out of the existing spans with the new span interrupted rail traffic for only 14 hrs. The history and many changes over the period of service of this railroad crossing are examined

About this research paper

What this paper is about

Modifications are made to a main-line single track railroad draw bridge across a much used wateway connecting the industrial Gulf Coast with the areas served by the Mississippi River. The outmoded draw bridge was a deterrent to the safe passage of vessels using this waterway. Two existing trusses near the center of the crossing are replaced by a 370-ft (113-m) vertical lift span to provide better alignment and greater width to the navigation channel through the bridge. The remains of an earlier bridge near this site required the extraction of old timber pile tips from a water depth of 70 ft (21 m). Numerous collisions to the structure by tows hampered the new construction and emphasized the need for improvements made to the structure. The change-out of the existing spans with the new span interrupted rail traffic for only 14 hrs. The history and many changes over the period of service of this railroad crossing are examined

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Modifications are made to a main-line single track railroad draw bridge across a much used wateway connecting the industrial Gulf Coast with the areas served by the Mississippi River. The outmoded draw bridge was a deterrent to the safe passage of vessels using this waterway. Two existing trusses near the center of the crossing are replaced by a 370-ft (113-m) vertical lift span to provide better alignment and greater width to the navigation channel through the bridge. The remains of an earlier bridge near this site required the extraction of old timber pile tips from a water depth of 70 ft (21 m). Numerous collisions to the structure by tows hampered the new construction and emphasized the need for improvements made to the structure. The change-out of the existing spans with the new span interrupted rail traffic for only 14 hrs. The history and many changes over the period of service of this railroad crossing are examined

Key concepts: Culvert, Bridge (graph theory), Bay, Span (engineering), Track (disk drive), Railway line, Lift (data mining), Pile