Railroad Crossings at Berwick Bay
Thomas E. Petermann
Abstract
Thomas E. Petermann
Abstract
Modifications are made to a main-line single track railroad draw bridge across a much used wateway connecting the industrial Gulf Coast with the areas served by the Mississippi River. The outmoded draw bridge was a deterrent to the safe passage of vessels using this waterway. Two existing trusses near the center of the crossing are replaced by a 370-ft (113-m) vertical lift span to provide better alignment and greater width to the navigation channel through the bridge. The remains of an earlier bridge near this site required the extraction of old timber pile tips from a water depth of 70 ft (21 m). Numerous collisions to the structure by tows hampered the new construction and emphasized the need for improvements made to the structure. The change-out of the existing spans with the new span interrupted rail traffic for only 14 hrs. The history and many changes over the period of service of this railroad crossing are examined
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Modifications are made to a main-line single track railroad draw bridge across a much used wateway connecting the industrial Gulf Coast with the areas served by the Mississippi River. The outmoded draw bridge was a deterrent to the safe passage of vessels using this waterway. Two existing trusses near the center of the crossing are replaced by a 370-ft (113-m) vertical lift span to provide better alignment and greater width to the navigation channel through the bridge. The remains of an earlier bridge near this site required the extraction of old timber pile tips from a water depth of 70 ft (21 m). Numerous collisions to the structure by tows hampered the new construction and emphasized the need for improvements made to the structure. The change-out of the existing spans with the new span interrupted rail traffic for only 14 hrs. The history and many changes over the period of service of this railroad crossing are examined
Key concepts: Culvert, Bridge (graph theory), Bay, Span (engineering), Track (disk drive), Railway line, Lift (data mining), Pile