FMS scheduling: A crucial element in an expert system control structure
Andrew Kusiak
Abstract
Andrew Kusiak
Abstract
In this paper a structure of the manufacturing expert system is presented. This system is to control three subsystems: process planning, programming of robots and machines and production planning. One of the basic elements of the production planning system is the production scheduling. A scheduling framework together with the heuristic scheduling algorithm are developed. The algorithm is illustrated on a numerical example.
OpenAlex reports 9 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In this paper a structure of the manufacturing expert system is presented. This system is to control three subsystems: process planning, programming of robots and machines and production planning. One of the basic elements of the production planning system is the production scheduling. A scheduling framework together with the heuristic scheduling algorithm are developed. The algorithm is illustrated on a numerical example.
Key concepts: Production planning, Scheduling (production processes), Computer science, Automated planning and scheduling, Production control, Dynamic priority scheduling, Two-level scheduling, Fair-share scheduling