Energy Saving Analysis of Air-conditioning System of an Existing Office Buildings in Shanghai
Han Xing, Ma Kehua, Zhang Beihong
Abstract
Han Xing, Ma Kehua, Zhang Beihong
Abstract
According to the present problems of existing office buildings using air source heat pump, countermeasures were brought forward to solve the problems, such as changing part of the present air source heat pumps to water-cooled cold water units, changing present units into new air source heat pumps and pump variable frequency renovation. According to the case study in this paper, the static return period are 2years, 5-7years and 1-4years for each measure.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
According to the present problems of existing office buildings using air source heat pump, countermeasures were brought forward to solve the problems, such as changing part of the present air source heat pumps to water-cooled cold water units, changing present units into new air source heat pumps and pump variable frequency renovation. According to the case study in this paper, the static return period are 2years, 5-7years and 1-4years for each measure.
Key concepts: Air conditioning, Heat pump, Air source heat pumps, Water heating, Environmental science, Engineering, Architectural engineering, Civil engineering