Ground-Shotcrete Interaction of NATM Tunnels with High Overburden
Daniela Boldini, Roman Lackner, Herbert A. Mang
Abstract
Daniela Boldini, Roman Lackner, Herbert A. Mang
Abstract
According to the New Austrian Tunneling Method (NATM), after excavation of a cross section of a tunnel, shotcrete is applied onto the tunnel walls, constituting a thin flexible, closed shell. Deformations, as well as the loading of the lining, are continuously monitored during construction, serving as input for the decision making process following the closed control cycle “excavation–monitoring–parameter adaptation–excavation”. The objective of this control cycle is to optimize the tunneling process with respect to cost, crew safety, and long-term tunnel stability. In this paper, questions related to this optimization process are addressed, dealing with the influence of driving parameters and changes in the in situ geological and geotechnical conditions on the deformation and loading of the shotcrete lining. Based on realistic material models for shotcrete and ground, axisymmetric analyses, allowing for consideration of the three-dimensional nature of the tunnel excavation, were performed. The assumption of axisymmetry represents a good approximation of the static conditions of tunnels with high overburden. The obtained results are presented in dimensionless form, providing new insights into the complex ground-shotcrete interaction in NATM tunneling.
OpenAlex reports 14 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
According to the New Austrian Tunneling Method (NATM), after excavation of a cross section of a tunnel, shotcrete is applied onto the tunnel walls, constituting a thin flexible, closed shell. Deformations, as well as the loading of the lining, are continuously monitored during construction, serving as input for the decision making process following the closed control cycle “excavation–monitoring–parameter adaptation–excavation”. The objective of this control cycle is to optimize the tunneling process with respect to cost, crew safety, and long-term tunnel stability. In this paper, questions related to this optimization process are addressed, dealing with the influence of driving parameters and changes in the in situ geological and geotechnical conditions on the deformation and loading of the shotcrete lining. Based on realistic material models for shotcrete and ground, axisymmetric analyses, allowing for consideration of the three-dimensional nature of the tunnel excavation, were performed. The assumption of axisymmetry represents a good approximation of the static conditions of tunnels with high overburden. The obtained results are presented in dimensionless form, providing new insights into the complex ground-shotcrete interaction in NATM tunneling.
Key concepts: Shotcrete, New Austrian Tunnelling method, Geotechnical engineering, Overburden, Geology, Engineering, Excavation