Riprap of bridge piers is placed to prevent scour and to secure the pier from failure. Riprap is therefore an addition to a pier to increase its performance against scour. The present research intends to present three basic scour mechanisms associated with circular-shaped bridge piers in rivers first, to introduce then a number of selected experiments for a range of hydraulic, geometric, and sedimentologic conditions, and finally to describe a novel procedure for assessing the safety of these river elements against failure. This procedure is based on the Shields diagram relating to sediment entrainment in a uniform and flat sediment bed subjected by a water flow. The Shields approach is extended for the presence of a circular-shaped pier that is protected by a circular-arranged riprap layer of equal size elements. The design procedure presented in the following thus reduces to the entrainment condition of a pier for equal riprap and the sediment sizes and to the Shields entrainment condition when the pier diameter degenerates to 0.

About this research paper

What this paper is about

Riprap of bridge piers is placed to prevent scour and to secure the pier from failure. Riprap is therefore an addition to a pier to increase its performance against scour. The present research intends to present three basic scour mechanisms associated with circular-shaped bridge piers in rivers first, to introduce then a number of selected experiments for a range of hydraulic, geometric, and sedimentologic conditions, and finally to describe a novel procedure for assessing the safety of these river elements against failure. This procedure is based on the Shields diagram relating to sediment entrainment in a uniform and flat sediment bed subjected by a water flow. The Shields approach is extended for the presence of a circular-shaped pier that is protected by a circular-arranged riprap layer of equal size elements. The design procedure presented in the following thus reduces to the entrainment condition of a pier for equal riprap and the sediment sizes and to the Shields entrainment condition when the pier diameter degenerates to 0.

Why it matters

OpenAlex reports 41 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Riprap of bridge piers is placed to prevent scour and to secure the pier from failure. Riprap is therefore an addition to a pier to increase its performance against scour. The present research intends to present three basic scour mechanisms associated with circular-shaped bridge piers in rivers first, to introduce then a number of selected experiments for a range of hydraulic, geometric, and sedimentologic conditions, and finally to describe a novel procedure for assessing the safety of these river elements against failure. This procedure is based on the Shields diagram relating to sediment entrainment in a uniform and flat sediment bed subjected by a water flow. The Shields approach is extended for the presence of a circular-shaped pier that is protected by a circular-arranged riprap layer of equal size elements. The design procedure presented in the following thus reduces to the entrainment condition of a pier for equal riprap and the sediment sizes and to the Shields entrainment condition when the pier diameter degenerates to 0.

Key concepts: Riprap, Pier, Bridge scour, Geotechnical engineering, Shields, Geology, Hydraulics, Entrainment (biomusicology)