2007Water Resources ResearchRequires access

Sediment budget of the Yangtze River

Zhaoyin Wang, Yitian Li, Yiping He

Open publisher page 129 citations

Abstract

The sediment budget is a method to study the distribution of sediment in different parts of a river basin. This paper studies the sediment budget of the Yangtze River by analyzing the data on soil erosion, size distributions of sediment deposits, sediment load, and fluvial process. A method to determine the sediment budget for the Yangtze River is proposed in which the total soil erosion from the upstream reaches and tributaries is divided into two parts: sediment load transported to the Yichang station and sediment storage in the tributaries and gullies. Furthermore, the sediment load is divided into three parts: bed material load deposited in the middle and lower reaches for the fluvial process, wash load transported to the estuary, and sediment deposition in Tongting Lake. The sediment transported into the estuary is further divided into two parts: very fine sediment drifting to the ocean and sediment deposition in the estuary for land creation. There is a large sediment demand for (1) the fluvial process to reach the minimum stream power in the middle and lower reaches; (2) sediment mining for building material; and (3) land creation in the estuary. The riverbed profile in the middle and lower reaches is developing toward the equilibrium profile defined by the minimum stream power, but the impoundment of the Three Gorges Reservoir interrupts and modifies this fluvial process. The annual sediment load in the Yangtze River has reduced due to various human activities by about 100 × 106 t in the past 15 years. Thus there is a sediment shortage for land creation in the river mouth.

About this research paper

What this paper is about

The sediment budget is a method to study the distribution of sediment in different parts of a river basin. This paper studies the sediment budget of the Yangtze River by analyzing the data on soil erosion, size distributions of sediment deposits, sediment load, and fluvial process. A method to determine the sediment budget for the Yangtze River is proposed in which the total soil erosion from the upstream reaches and tributaries is divided into two parts: sediment load transported to the Yichang station and sediment storage in the tributaries and gullies. Furthermore, the sediment load is divided into three parts: bed material load deposited in the middle and lower reaches for the fluvial process, wash load transported to the estuary, and sediment deposition in Tongting Lake. The sediment transported into the estuary is further divided into two parts: very fine sediment drifting to the ocean and sediment deposition in the estuary for land creation. There is a large sediment demand for (1) the fluvial process to reach the minimum stream power in the middle and lower reaches; (2) sediment mining for building material; and (3) land creation in the estuary. The riverbed profile in the middle and lower reaches is developing toward the equilibrium profile defined by the minimum stream power, but the impoundment of the Three Gorges Reservoir interrupts and modifies this fluvial process. The annual sediment load in the Yangtze River has reduced due to various human activities by about 100 × 106 t in the past 15 years. Thus there is a sediment shortage for land creation in the river mouth.

Why it matters

OpenAlex reports 129 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The sediment budget is a method to study the distribution of sediment in different parts of a river basin. This paper studies the sediment budget of the Yangtze River by analyzing the data on soil erosion, size distributions of sediment deposits, sediment load, and fluvial process. A method to determine the sediment budget for the Yangtze River is proposed in which the total soil erosion from the upstream reaches and tributaries is divided into two parts: sediment load transported to the Yichang station and sediment storage in the tributaries and gullies. Furthermore, the sediment load is divided into three parts: bed material load deposited in the middle and lower reaches for the fluvial process, wash load transported to the estuary, and sediment deposition in Tongting Lake. The sediment transported into the estuary is further divided into two parts: very fine sediment drifting to the ocean and sediment deposition in the estuary for land creation. There is a large sediment demand for (1) the fluvial process to reach the minimum stream power in the middle and lower reaches; (2) sediment mining for building material; and (3) land creation in the estuary. The riverbed profile in the middle and lower reaches is developing toward the equilibrium profile defined by the minimum stream power, but the impoundment of the Three Gorges Reservoir interrupts and modifies this fluvial process. The annual sediment load in the Yangtze River has reduced due to various human activities by about 100 × 106 t in the past 15 years. Thus there is a sediment shortage for land creation in the river mouth.

Key concepts: Sedimentary budget, Tributary, Sediment, Fluvial, Hydrology (agriculture), Estuary, Erosion, Deposition (geology)

Related papers

Back to paper searchBrowse research topicsOriginal source
Sediment budget of the Yangtze River — Research Paper | ScholarLens