Present status of NSLS-II design and construction
Sanjeev Sharma, Andrew Broadbent, L. Doom, M. Fallier, H. Hseuh, B. Kosciuk, V. Ravindranath, Timur Shaftan, А. И. Ситников, J. Skaritka
Abstract
Sanjeev Sharma, Andrew Broadbent, L. Doom, M. Fallier, H. Hseuh, B. Kosciuk, V. Ravindranath, Timur Shaftan, А. И. Ситников, J. Skaritka
Abstract
National Synchrotron Light Source (NSLS-II) is a new 3 GeV, 500 mA, high-brightness synchrotron light source facility being built at the Brookhaven National Laboratory. Approved for construction in January 2009, the NSLS-II project is expected to be completed in June 2014. In this paper we discuss the present status of the mechanical design and construction of some major components of this facility, namely (i) conventional facilities, (ii) injector complex (iii) storage ring, (iv) RF system and (v) beamlines.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
National Synchrotron Light Source (NSLS-II) is a new 3 GeV, 500 mA, high-brightness synchrotron light source facility being built at the Brookhaven National Laboratory. Approved for construction in January 2009, the NSLS-II project is expected to be completed in June 2014. In this paper we discuss the present status of the mechanical design and construction of some major components of this facility, namely (i) conventional facilities, (ii) injector complex (iii) storage ring, (iv) RF system and (v) beamlines.
Key concepts: National laboratory, Storage ring, Synchrotron light source, Synchrotron, Physics, Particle accelerator, Linear particle accelerator, Brightness