COINCIDENT FLOOD FREQUENCY ANALYSIS FOR DESIGN OF CHAO PHRAYA RIVER FLOOD CONTROL SYSTEM FOR BANGKOK

Tawatchai Tingsanchali, Kitpaisalsakul, T., Professor, Water Engineering and Mangement Program, School of Civil Engineering, Asian Institute of Technology, Lecturer, Chulalongkorn University

Open full text 0 citations

Abstract

Flood levels of the Chao Phraya river at Bangkok is strongly influenced by the upstream river flood levels at Bangsai and the tide levels at the river mouth at Fort Chula. A flood control system was earlier proposed by the Asian lnstitute of Technology and the Thai• Austrian Consortium for Bangkok in 1986.  However,  no coincident flood frequency analysis was done.  In this  study,  a coincident  flood frequency  analysis  is  applied  to determine  the significance of the flood levels at Bangsai and the tide levels at Fort Chula on the flood levels at Bangkok. Also, the change in the return period of flood overtopping the existing river dikes with and without the proposed flood control scheme is determined.  It is found that the return period of flood overtopping the river dikes is 2.5 years when there is no flood control scheme and is more than 1000 years when considering the flood control scheme.

About this research paper

What this paper is about

Flood levels of the Chao Phraya river at Bangkok is strongly influenced by the upstream river flood levels at Bangsai and the tide levels at the river mouth at Fort Chula. A flood control system was earlier proposed by the Asian lnstitute of Technology and the Thai• Austrian Consortium for Bangkok in 1986.  However,  no coincident flood frequency analysis was done.  In this  study,  a coincident  flood frequency  analysis  is  applied  to determine  the significance of the flood levels at Bangsai and the tide levels at Fort Chula on the flood levels at Bangkok. Also, the change in the return period of flood overtopping the existing river dikes with and without the proposed flood control scheme is determined.  It is found that the return period of flood overtopping the river dikes is 2.5 years when there is no flood control scheme and is more than 1000 years when considering the flood control scheme.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Flood levels of the Chao Phraya river at Bangkok is strongly influenced by the upstream river flood levels at Bangsai and the tide levels at the river mouth at Fort Chula. A flood control system was earlier proposed by the Asian lnstitute of Technology and the Thai• Austrian Consortium for Bangkok in 1986.  However,  no coincident flood frequency analysis was done.  In this  study,  a coincident  flood frequency  analysis  is  applied  to determine  the significance of the flood levels at Bangsai and the tide levels at Fort Chula on the flood levels at Bangkok. Also, the change in the return period of flood overtopping the existing river dikes with and without the proposed flood control scheme is determined.  It is found that the return period of flood overtopping the river dikes is 2.5 years when there is no flood control scheme and is more than 1000 years when considering the flood control scheme.

Key concepts: Flood myth, Flood control, Dike, 100-year flood, Flood stage, Hydrology (agriculture), Return period, Water level