Wheeling Rates Based on Marginal-Cost Theory
H.M. Merrill, Bruce W. Erickson
Abstract
H.M. Merrill, Bruce W. Erickson
Abstract
Knowledge of what rates for wheeling electric power should be, if based on marginal costs, is vital in the debate on how wheeling should be priced. The authors present extensive computations of marginal costs. Sensitivities to losses, constraints, load levels, amount of power wheeled, revenue reconciliation, etc. are examined in the context of two case studies. Revenue reconciliation for capital recovery is described briefly. >
OpenAlex reports 60 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Knowledge of what rates for wheeling electric power should be, if based on marginal costs, is vital in the debate on how wheeling should be priced. The authors present extensive computations of marginal costs. Sensitivities to losses, constraints, load levels, amount of power wheeled, revenue reconciliation, etc. are examined in the context of two case studies. Revenue reconciliation for capital recovery is described briefly. >
Key concepts: Wheeling, Marginal cost, Context (archaeology), Revenue, Economics, Marginal utility, Power (physics), Capital (architecture)