STATUS OF THE NOMINAL PROTON BEAM FOR LHC IN THE PS
R. Garoby
Abstract
Open-access reader
R. Garoby
Abstract
Open-access reader
The RF systems which are necessary for the generation of the nominal proton beam for the LHC in the PS Complex have been installed in the PSB and in the PS during the shutdown 97-98. This has permitted the complete set of longitudinal operations required by this beam to be tested and adjusted. The hardware status and the results achieved so far are summarised in this paper. The subjects of study, the foreseen improvements and the expected beam characteristics in 1999 are also described.
OpenAlex reports 12 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The RF systems which are necessary for the generation of the nominal proton beam for the LHC in the PS Complex have been installed in the PSB and in the PS during the shutdown 97-98. This has permitted the complete set of longitudinal operations required by this beam to be tested and adjusted. The hardware status and the results achieved so far are summarised in this paper. The subjects of study, the foreseen improvements and the expected beam characteristics in 1999 are also described.
Key concepts: Beam (structure), Large Hadron Collider, Proton, Physics, Nuclear physics, Nuclear engineering, Electrical engineering, Engineering