1986IEEE Transactions on Power SystemsRequires access

The Finnish Power System Control Centre

Johnny Bistrom, Kurt Lindström

Open publisher page 0 citations

Abstract

The operating philosophy for controlling the Finnish power system is based on production conditions, which include hydro, nuclear and coal-fired power plants, and joint national and international operation. On top of the control hierarchy is the Control Centre which has eight District Centres under its command. The Control Centre system, which was placed in full operation in 1982, consists of three subsystems: the Main, the Front-End and the Automatic Generation Control Computer systems which together with the District Centre Computer systems form an extensive computer network. The Main Computer system includes the most common SCADA-functions and EMS features such as State Estimation, Operators Load Flow and Load Forecasting among others.

About this research paper

What this paper is about

The operating philosophy for controlling the Finnish power system is based on production conditions, which include hydro, nuclear and coal-fired power plants, and joint national and international operation. On top of the control hierarchy is the Control Centre which has eight District Centres under its command. The Control Centre system, which was placed in full operation in 1982, consists of three subsystems: the Main, the Front-End and the Automatic Generation Control Computer systems which together with the District Centre Computer systems form an extensive computer network. The Main Computer system includes the most common SCADA-functions and EMS features such as State Estimation, Operators Load Flow and Load Forecasting among others.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The operating philosophy for controlling the Finnish power system is based on production conditions, which include hydro, nuclear and coal-fired power plants, and joint national and international operation. On top of the control hierarchy is the Control Centre which has eight District Centres under its command. The Control Centre system, which was placed in full operation in 1982, consists of three subsystems: the Main, the Front-End and the Automatic Generation Control Computer systems which together with the District Centre Computer systems form an extensive computer network. The Main Computer system includes the most common SCADA-functions and EMS features such as State Estimation, Operators Load Flow and Load Forecasting among others.

Key concepts: SCADA, Electric power system, Automatic Generation Control, Engineering, Hierarchy, Control engineering, Electricity generation, Control system