DSC: scheduling parallel tasks on an unbounded number of processors
Tao Yang, Apostolos Gerasoulis
Abstract
Tao Yang, Apostolos Gerasoulis
Abstract
We present a low-complexity heuristic, named the dominant sequence clustering algorithm (DSC), for scheduling parallel tasks on an unbounded number of completely connected processors. The performance of DSC is on average, comparable to, or even better than, other higher-complexity algorithms. We assume no task duplication and nonzero communication overhead between processors. Finding the optimum solution for arbitrary directed acyclic task graphs (DAG's) is NP-complete. DSC finds optimal schedules for special classes of DAG's, such as fork, join, coarse-grain trees, and some fine-grain trees. It guarantees a performance within a factor of 2 of the optimum for general coarse-grain DAG's. We compare DSC with three higher-complexity general scheduling algorithms: the ETF by J.J. Hwang, Y.C. Chow, F.D. Anger, and C.Y. Lee (1989); V. Sarkar's (1989) clustering algorithm; and the MD by M.Y. Wu and D. Gajski (1990). We also give a sample of important practical applications where DSC has been found useful.>
OpenAlex reports 652 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
We present a low-complexity heuristic, named the dominant sequence clustering algorithm (DSC), for scheduling parallel tasks on an unbounded number of completely connected processors. The performance of DSC is on average, comparable to, or even better than, other higher-complexity algorithms. We assume no task duplication and nonzero communication overhead between processors. Finding the optimum solution for arbitrary directed acyclic task graphs (DAG's) is NP-complete. DSC finds optimal schedules for special classes of DAG's, such as fork, join, coarse-grain trees, and some fine-grain trees. It guarantees a performance within a factor of 2 of the optimum for general coarse-grain DAG's. We compare DSC with three higher-complexity general scheduling algorithms: the ETF by J.J. Hwang, Y.C. Chow, F.D. Anger, and C.Y. Lee (1989); V. Sarkar's (1989) clustering algorithm; and the MD by M.Y. Wu and D. Gajski (1990). We also give a sample of important practical applications where DSC has been found useful.>
Key concepts: Computer science, Directed acyclic graph, Scheduling (production processes), Cluster analysis, Parallel computing, Overhead (engineering), Heuristic, Algorithm