2013International Journal of Productivity and Quality ManagementRequires access

A modified range (R) chart to monitor process dispersion of autocorrelated data

Sukhraj Singh, D.R. Prajapati

Open publisher page 2 citations

Abstract

The range (R) charts are widely used in industries to monitor the process dispersion. Monitoring process dispersion is as important as monitoring the process mean. In actual practice, some process outputs are correlated, the performance of R chart may have adverse effect on it. The performance of the chart is measured in terms of the average run length (ARL), which is the average number of samples before an out-of-control signal is obtained. Ultimately, the performance of these charts may be suspected due to autocorrelation. In this paper, an attempt is made to counter the autocorrelation by designing the new R chart named modified R chart, based on sum of chi-squares. The performance of this modified R chart is computed for sample sizes of 3 and 5. It is observed that when the level of correlation (Φ) increases, the performance of the modified R chart deteriorates. Moreover, the modified R chart for sample size of three and five is compared with adaptive R charts, suggested by Lee (2011) at zero level of correlation (Φ). It is found that modified R chart performs better than adaptive R charts for most of the cases.

About this research paper

What this paper is about

The range (R) charts are widely used in industries to monitor the process dispersion. Monitoring process dispersion is as important as monitoring the process mean. In actual practice, some process outputs are correlated, the performance of R chart may have adverse effect on it. The performance of the chart is measured in terms of the average run length (ARL), which is the average number of samples before an out-of-control signal is obtained. Ultimately, the performance of these charts may be suspected due to autocorrelation. In this paper, an attempt is made to counter the autocorrelation by designing the new R chart named modified R chart, based on sum of chi-squares. The performance of this modified R chart is computed for sample sizes of 3 and 5. It is observed that when the level of correlation (Φ) increases, the performance of the modified R chart deteriorates. Moreover, the modified R chart for sample size of three and five is compared with adaptive R charts, suggested by Lee (2011) at zero level of correlation (Φ). It is found that modified R chart performs better than adaptive R charts for most of the cases.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The range (R) charts are widely used in industries to monitor the process dispersion. Monitoring process dispersion is as important as monitoring the process mean. In actual practice, some process outputs are correlated, the performance of R chart may have adverse effect on it. The performance of the chart is measured in terms of the average run length (ARL), which is the average number of samples before an out-of-control signal is obtained. Ultimately, the performance of these charts may be suspected due to autocorrelation. In this paper, an attempt is made to counter the autocorrelation by designing the new R chart named modified R chart, based on sum of chi-squares. The performance of this modified R chart is computed for sample sizes of 3 and 5. It is observed that when the level of correlation (Φ) increases, the performance of the modified R chart deteriorates. Moreover, the modified R chart for sample size of three and five is compared with adaptive R charts, suggested by Lee (2011) at zero level of correlation (Φ). It is found that modified R chart performs better than adaptive R charts for most of the cases.

Key concepts: Chart, X-bar chart, Autocorrelation, EWMA chart, \bar x and R chart, Statistics, Control chart, Dispersion (optics)

Related papers

Back to paper searchBrowse research topicsOriginal source
A modified range (R) chart to monitor process dispersion of autocorrelated data — Research Paper | ScholarLens