Dredging Research Program. Results of Monitoring the Disposal Berm at Sand Island, Alabama. Report 1. Construction and First Year's Response

Edward B. Hands, K. Paul. Bradley

Open publisher page 1 citations

Abstract

Abstract : As part of a continuing improvement of economic and environmental aspects of dredging, the US Army Corps of Engineers is conducting underwater construction of berms at various locations on the seafloor. Selected berms are monitored to evaluate their stability and potential usefulness for reducing beach erosion caused by ocean waves and tides and for increasing sand supply along coastal regions. This report describes experimental placement methods used along with a comparison between expected results and those actually achieved. Background site information and measured environmental conditions are summarized. Results of the first year's monitoring are discussed.

About this research paper

What this paper is about

Abstract : As part of a continuing improvement of economic and environmental aspects of dredging, the US Army Corps of Engineers is conducting underwater construction of berms at various locations on the seafloor. Selected berms are monitored to evaluate their stability and potential usefulness for reducing beach erosion caused by ocean waves and tides and for increasing sand supply along coastal regions. This report describes experimental placement methods used along with a comparison between expected results and those actually achieved. Background site information and measured environmental conditions are summarized. Results of the first year's monitoring are discussed.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract : As part of a continuing improvement of economic and environmental aspects of dredging, the US Army Corps of Engineers is conducting underwater construction of berms at various locations on the seafloor. Selected berms are monitored to evaluate their stability and potential usefulness for reducing beach erosion caused by ocean waves and tides and for increasing sand supply along coastal regions. This report describes experimental placement methods used along with a comparison between expected results and those actually achieved. Background site information and measured environmental conditions are summarized. Results of the first year's monitoring are discussed.

Key concepts: Berm, Dredging, Environmental science, Erosion, Beach nourishment, Underwater, Coastal erosion, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Dredging Research Program. Results of Monitoring the Disposal Berm at Sand Island, Alabama. Report 1. Construction and First Year's Response — Research Paper | ScholarLens