TIME‐VARYING TERM PREMIA AND THE BEHAVIOR OF FORWARD INTEREST RATE PREDICTION ERRORS
Sridhar Iyer
Abstract
Sridhar Iyer
Abstract
Abstract In this paper I examine the time‐varying expected term premium argument for the failure of the expectations hypothesis of the term structure of U.S. interest rates. Using an unobserved components model to estimate expected term premia from March 1951 to January 1991, I find considerable variation in estimated premia and significant persistence in their volatility over time.
OpenAlex reports 11 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Abstract In this paper I examine the time‐varying expected term premium argument for the failure of the expectations hypothesis of the term structure of U.S. interest rates. Using an unobserved components model to estimate expected term premia from March 1951 to January 1991, I find considerable variation in estimated premia and significant persistence in their volatility over time.
Key concepts: Term (time), Forward rate, Econometrics, Economics, Volatility (finance), Risk premium, Interest rate, Short rate