Construction Monitoring Technology Analysis for Railway Tunnel
Jin Fang Hou, Jun Chen, Rong Li Wang
Abstract
Jin Fang Hou, Jun Chen, Rong Li Wang
Abstract
Based on the railway tunnel engineering, the research on comprehensive technological for the monitoring of tunnel construction is performed. It is shown that the deformation of wall rock would mainly suffer the comprehensive influence of multiple factors like type of the wall rock, construction method and supporting measures, size of the excavated section, etc. through the monitoring of the crown settlement, clearance convergence and ground settlement. The wall rock will be stable within 20d and 40d after the tunnel excavation. And the secondary tunnel lining could be constructed. Numerical simulation method was also adopted to analyze the deformation and stress of the wall rock. It is presented that the construction interval shall not be too long for the stability of wall rock. Therefore, the numerical analysis method and site monitoring method could be used together to achieve more comprehensive and reliable monitoring of tunnel construction.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Based on the railway tunnel engineering, the research on comprehensive technological for the monitoring of tunnel construction is performed. It is shown that the deformation of wall rock would mainly suffer the comprehensive influence of multiple factors like type of the wall rock, construction method and supporting measures, size of the excavated section, etc. through the monitoring of the crown settlement, clearance convergence and ground settlement. The wall rock will be stable within 20d and 40d after the tunnel excavation. And the secondary tunnel lining could be constructed. Numerical simulation method was also adopted to analyze the deformation and stress of the wall rock. It is presented that the construction interval shall not be too long for the stability of wall rock. Therefore, the numerical analysis method and site monitoring method could be used together to achieve more comprehensive and reliable monitoring of tunnel construction.
Key concepts: Excavation, Settlement (finance), Tunnel construction, Geotechnical engineering, Engineering, Wall rock, Deformation (meteorology), Deformation monitoring