2014Unpublished venueRequires access

Key Technologies for HDD Crossing with Complex Geological Conditions and Large Diameter Pipelines

Xiaocheng Ma, Guohui Li, Hongxin Ma, Wei He

Open publisher page 0 citations

Abstract

A trenchless pipeline HDD crossing is a key project of oil and gas pipeline construction. Although technology is relatively mature, with the requirements of larger diameter, longer crossing span and much more complex geological conditions, a lot of problems have emerged in the design and construction process. Thus, failure of project cases are markedly increased and will eventually result in great loss. Currently, a long distance, large diameter HDD crossing in complex geological conditions has many key issues. This article analyzes the HDD technology status and existing problems in China. It discusses the design and construction ideas and development direction in the future for HDD, utilizing the aided design tools, improved design and construction quality to guide the smooth implementation of HDD construction.

About this research paper

What this paper is about

A trenchless pipeline HDD crossing is a key project of oil and gas pipeline construction. Although technology is relatively mature, with the requirements of larger diameter, longer crossing span and much more complex geological conditions, a lot of problems have emerged in the design and construction process. Thus, failure of project cases are markedly increased and will eventually result in great loss. Currently, a long distance, large diameter HDD crossing in complex geological conditions has many key issues. This article analyzes the HDD technology status and existing problems in China. It discusses the design and construction ideas and development direction in the future for HDD, utilizing the aided design tools, improved design and construction quality to guide the smooth implementation of HDD construction.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A trenchless pipeline HDD crossing is a key project of oil and gas pipeline construction. Although technology is relatively mature, with the requirements of larger diameter, longer crossing span and much more complex geological conditions, a lot of problems have emerged in the design and construction process. Thus, failure of project cases are markedly increased and will eventually result in great loss. Currently, a long distance, large diameter HDD crossing in complex geological conditions has many key issues. This article analyzes the HDD technology status and existing problems in China. It discusses the design and construction ideas and development direction in the future for HDD, utilizing the aided design tools, improved design and construction quality to guide the smooth implementation of HDD construction.

Key concepts: Trenchless technology, Pipeline transport, Key (lock), Span (engineering), Pipeline (software), Process (computing), Engineering, Directional drilling

Related papers

Back to paper searchBrowse research topicsOriginal source
Key Technologies for HDD Crossing with Complex Geological Conditions and Large Diameter Pipelines — Research Paper | ScholarLens