1985Unpublished venueRequires access

The Economic Assessment of Proposed CHP Installations

Peter Bonham

Open publisher page 0 citations

Abstract

Various methods for the economic evaluation of proposed gas turbine combined heat and power plants are discussed. These vary from the simple annual average method to a complex computer simulation based model. The paper describes in detail the use of a program which simulates turbine and boiler performance from data provided by a potential customer. This data takes the form of load and steam demands for typical operating days. The method has been developed for the United Kingdom market but could be adapted to suit any country.

About this research paper

What this paper is about

Various methods for the economic evaluation of proposed gas turbine combined heat and power plants are discussed. These vary from the simple annual average method to a complex computer simulation based model. The paper describes in detail the use of a program which simulates turbine and boiler performance from data provided by a potential customer. This data takes the form of load and steam demands for typical operating days. The method has been developed for the United Kingdom market but could be adapted to suit any country.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Various methods for the economic evaluation of proposed gas turbine combined heat and power plants are discussed. These vary from the simple annual average method to a complex computer simulation based model. The paper describes in detail the use of a program which simulates turbine and boiler performance from data provided by a potential customer. This data takes the form of load and steam demands for typical operating days. The method has been developed for the United Kingdom market but could be adapted to suit any country.

Key concepts: Steam turbine, Boiler (water heating), Gas turbines, Computer science, Cogeneration, Turbine, Engineering, Electricity generation

Related papers

Back to paper searchBrowse research topicsOriginal source
The Economic Assessment of Proposed CHP Installations — Research Paper | ScholarLens