2009Unpublished venueRequires access

Study on work improvement in a packaging machine manufacturing company

Xue Feng Sun, Guang Cheng, Wei Li

Open publisher page 8 citations

Abstract

This paper studies the improvement of production efficiency and balance rate of the manual assembly line in a packaging machine manufacturing company. Modular arrangement of predetermined time standards (MODAPTS) method is used to obtain time values for elements and for entire operations of the manual assembly line. Also the ECRS four principles (eliminate, combine, rearrange and simple) are used to minimize the idle time at every station or the percentage of line balance loss. In order to verify the results that were obtained from the generated line-balancing pre- and post-, Witness simulation software is used to estimate the output. Simulation results showed that productivity increases about 41.72% higher than the current situation.

About this research paper

What this paper is about

This paper studies the improvement of production efficiency and balance rate of the manual assembly line in a packaging machine manufacturing company. Modular arrangement of predetermined time standards (MODAPTS) method is used to obtain time values for elements and for entire operations of the manual assembly line. Also the ECRS four principles (eliminate, combine, rearrange and simple) are used to minimize the idle time at every station or the percentage of line balance loss. In order to verify the results that were obtained from the generated line-balancing pre- and post-, Witness simulation software is used to estimate the output. Simulation results showed that productivity increases about 41.72% higher than the current situation.

Why it matters

OpenAlex reports 8 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper studies the improvement of production efficiency and balance rate of the manual assembly line in a packaging machine manufacturing company. Modular arrangement of predetermined time standards (MODAPTS) method is used to obtain time values for elements and for entire operations of the manual assembly line. Also the ECRS four principles (eliminate, combine, rearrange and simple) are used to minimize the idle time at every station or the percentage of line balance loss. In order to verify the results that were obtained from the generated line-balancing pre- and post-, Witness simulation software is used to estimate the output. Simulation results showed that productivity increases about 41.72% higher than the current situation.

Key concepts: Production line, Modular design, Computer science, Productivity, Line (geometry), Work (physics), Manufacturing engineering, Software

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on work improvement in a packaging machine manufacturing company — Research Paper | ScholarLens