Combined heat and power (CHP) or cogeneration systems provide both electricity and useful heat to a building. CHP systems can result in lower operational cost, primary energy consumption (PEC), and carbon dioxide emissions when compared to the standard alternative of purchasing electricity from the grid and supplying heat from a boiler. However, the potential for these benefits is closely linked to the relationship between the ratio of power to heat supplied by the CHP system and the ratio of power to heat demanded by the building. Therefore, the benefits of the CHP system also vary with the size of the prime mover. In the model presented in this paper, the CHP system is base-loaded, providing a constant power-to-heat ratio. The power-to-heat ratio demanded by the building depends on the location and the needs of the building, which vary throughout the day and throughout the year. At times when the CHP system does not provide the electricity needed by the building, electricity is purchased from the grid, and when the CHP system does not provide the heat needed by the building, heat is generated with a supplemental boiler. Thermal storage is an option to address the building’s load variation by storing excess heat when the building needs less heat than the heat produced by the CHP system, which can then be used later when the building needs more heat than the heat produced by the CHP system. The potential for a CHP system with thermal storage to reduce cost, PEC, and emissions is investigated, and compared with both a CHP system without thermal storage and with the standard reference case. This proposed model is evaluated for three different commercial building types in three different U.S. climate zones. The size of the power generation unit (PGU) is varied and the effect of the correspondingly smaller or larger base load on the cost, PEC, and emissions savings is analyzed. The most beneficial PGU size for a CHP system with the thermal storage option is compared with the most beneficial PGU size without the thermal storage option. The need for a supplemental boiler to provide additional heat is also examined in each case with the thermal storage option.

About this research paper

What this paper is about

Combined heat and power (CHP) or cogeneration systems provide both electricity and useful heat to a building. CHP systems can result in lower operational cost, primary energy consumption (PEC), and carbon dioxide emissions when compared to the standard alternative of purchasing electricity from the grid and supplying heat from a boiler. However, the potential for these benefits is closely linked to the relationship between the ratio of power to heat supplied by the CHP system and the ratio of power to heat demanded by the building. Therefore, the benefits of the CHP system also vary with the size of the prime mover. In the model presented in this paper, the CHP system is base-loaded, providing a constant power-to-heat ratio. The power-to-heat ratio demanded by the building depends on the location and the needs of the building, which vary throughout the day and throughout the year. At times when the CHP system does not provide the electricity needed by the building, electricity is purchased from the grid, and when the CHP system does not provide the heat needed by the building, heat is generated with a supplemental boiler. Thermal storage is an option to address the building’s load variation by storing excess heat when the building needs less heat than the heat produced by the CHP system, which can then be used later when the building needs more heat than the heat produced by the CHP system. The potential for a CHP system with thermal storage to reduce cost, PEC, and emissions is investigated, and compared with both a CHP system without thermal storage and with the standard reference case. This proposed model is evaluated for three different commercial building types in three different U.S. climate zones. The size of the power generation unit (PGU) is varied and the effect of the correspondingly smaller or larger base load on the cost, PEC, and emissions savings is analyzed. The most beneficial PGU size for a CHP system with the thermal storage option is compared with the most beneficial PGU size without the thermal storage option. The need for a supplemental boiler to provide additional heat is also examined in each case with the thermal storage option.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Combined heat and power (CHP) or cogeneration systems provide both electricity and useful heat to a building. CHP systems can result in lower operational cost, primary energy consumption (PEC), and carbon dioxide emissions when compared to the standard alternative of purchasing electricity from the grid and supplying heat from a boiler. However, the potential for these benefits is closely linked to the relationship between the ratio of power to heat supplied by the CHP system and the ratio of power to heat demanded by the building. Therefore, the benefits of the CHP system also vary with the size of the prime mover. In the model presented in this paper, the CHP system is base-loaded, providing a constant power-to-heat ratio. The power-to-heat ratio demanded by the building depends on the location and the needs of the building, which vary throughout the day and throughout the year. At times when the CHP system does not provide the electricity needed by the building, electricity is purchased from the grid, and when the CHP system does not provide the heat needed by the building, heat is generated with a supplemental boiler. Thermal storage is an option to address the building’s load variation by storing excess heat when the building needs less heat than the heat produced by the CHP system, which can then be used later when the building needs more heat than the heat produced by the CHP system. The potential for a CHP system with thermal storage to reduce cost, PEC, and emissions is investigated, and compared with both a CHP system without thermal storage and with the standard reference case. This proposed model is evaluated for three different commercial building types in three different U.S. climate zones. The size of the power generation unit (PGU) is varied and the effect of the correspondingly smaller or larger base load on the cost, PEC, and emissions savings is analyzed. The most beneficial PGU size for a CHP system with the thermal storage option is compared with the most beneficial PGU size without the thermal storage option. The need for a supplemental boiler to provide additional heat is also examined in each case with the thermal storage option.

Key concepts: Prime mover, Cogeneration, Thermal energy storage, Electricity, Process engineering, Boiler (water heating), Waste management, Environmental science

Related papers

Back to paper searchBrowse research topicsOriginal source
Impact of Thermal Storage Option for CHP Systems on the Optimal Prime Mover Size and the Need for Additional Heat Production — Research Paper | ScholarLens