Large scale wind power plants integration into the Croatian power system
Davor Škrlec, Igor Kuzle, Marko Delimar, Darjan Bošnjak, Tomislav Capuder, Hrvoje Pandžić
Abstract
Davor Škrlec, Igor Kuzle, Marko Delimar, Darjan Bošnjak, Tomislav Capuder, Hrvoje Pandžić
Abstract
The biggest proportion of renewable energy investments in Europe is focused on exploitation of wind power. Due to high investors' interest, Croatian power system is experiencing a metamorphosis to a modern power system with significant wind power penetration. This paper describes optimal connection points for the large amount of wind power plants expected to be installed. The calculus is performed in various scenarios in order to verify the obtained results. Based on acquired results, actions on improving transmission grid for wind power plants operation are described.
OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The biggest proportion of renewable energy investments in Europe is focused on exploitation of wind power. Due to high investors' interest, Croatian power system is experiencing a metamorphosis to a modern power system with significant wind power penetration. This paper describes optimal connection points for the large amount of wind power plants expected to be installed. The calculus is performed in various scenarios in order to verify the obtained results. Based on acquired results, actions on improving transmission grid for wind power plants operation are described.
Key concepts: Wind power, Renewable energy, Electric power system, Base load power plant, Power (physics), Electrical engineering, Grid connection, Intermittent energy source