2004Physical Review Special Topics - Accelerators and BeamsOpen access

Experimental results on electron beam combination and bunch frequency multiplication

R. Corsini, Arnaud Ferrari, L. Rinolfi, P. Royer, F. Tecker

Open full text 20 citations

Abstract

The aim of the CLIC Test Facility CTF3 at CERN is to demonstrate the feasibility of the key points of the two-beam acceleration based compact linear collider study. In particular, it addresses the efficient generation of a drive beam with the appropriate time structure of the electron bunches in order to produce high power rf pulses at a frequency of 30 GHz. This time structure requires a high bunch repetition frequency. It is obtained by successive injections of bunch trains into an isochronous ring using transversely deflecting rf structures. The major goal of the now completed first phase of the CTF3 was to achieve the bunch train combination at low charge. In this paper, we give a description of the project and summarize the experimental results, with a focus on the successful bunch frequency multiplication for various factors up to 5.

Open-access reader

About this research paper

What this paper is about

The aim of the CLIC Test Facility CTF3 at CERN is to demonstrate the feasibility of the key points of the two-beam acceleration based compact linear collider study. In particular, it addresses the efficient generation of a drive beam with the appropriate time structure of the electron bunches in order to produce high power rf pulses at a frequency of 30 GHz. This time structure requires a high bunch repetition frequency. It is obtained by successive injections of bunch trains into an isochronous ring using transversely deflecting rf structures. The major goal of the now completed first phase of the CTF3 was to achieve the bunch train combination at low charge. In this paper, we give a description of the project and summarize the experimental results, with a focus on the successful bunch frequency multiplication for various factors up to 5.

Why it matters

OpenAlex reports 20 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The aim of the CLIC Test Facility CTF3 at CERN is to demonstrate the feasibility of the key points of the two-beam acceleration based compact linear collider study. In particular, it addresses the efficient generation of a drive beam with the appropriate time structure of the electron bunches in order to produce high power rf pulses at a frequency of 30 GHz. This time structure requires a high bunch repetition frequency. It is obtained by successive injections of bunch trains into an isochronous ring using transversely deflecting rf structures. The major goal of the now completed first phase of the CTF3 was to achieve the bunch train combination at low charge. In this paper, we give a description of the project and summarize the experimental results, with a focus on the successful bunch frequency multiplication for various factors up to 5.

Key concepts: Bunches, Multiplication (music), Linear particle accelerator, Physics, Acceleration, Beam (structure), Collider, Electron

Related papers

Back to paper searchBrowse research topicsOriginal source
Experimental results on electron beam combination and bunch frequency multiplication — Research Paper | ScholarLens