2011•Structure and Infrastructure EngineeringRequires access

Estimation of pavement rehabilitation cost using pavement management data

Seung‐Tae Lee, Dae-Wook Park, Jose Leo Mission

Open publisher page 9 citations

Abstract

Estimation and scheduling of future pavement maintenance and rehabilitation (M&R) works are one of the primary concerns of highway agencies due to the limited allocations in budget and resources. Two approximate methods for estimation of pavement rehabilitation cost are presented and compared in this study based on highway present condition index (HPCI) and rehabilitation history. The former is based on pavement condition, while the latter is based on historical and statistical trends. Database from a pavement management system (PMS) of various highway sections surveyed in Korea were used in this study to establish a relationship between HPCI and pavement service life and to analyse the trends of rehabilitation periods. The two simple methods presented provide useful information and probable range for the various highway agencies to guide them in the preliminary planning, budgeting, estimating and scheduling of their future pavement M&R works.

About this research paper

What this paper is about

Estimation and scheduling of future pavement maintenance and rehabilitation (M&R) works are one of the primary concerns of highway agencies due to the limited allocations in budget and resources. Two approximate methods for estimation of pavement rehabilitation cost are presented and compared in this study based on highway present condition index (HPCI) and rehabilitation history. The former is based on pavement condition, while the latter is based on historical and statistical trends. Database from a pavement management system (PMS) of various highway sections surveyed in Korea were used in this study to establish a relationship between HPCI and pavement service life and to analyse the trends of rehabilitation periods. The two simple methods presented provide useful information and probable range for the various highway agencies to guide them in the preliminary planning, budgeting, estimating and scheduling of their future pavement M&R works.

Why it matters

OpenAlex reports 9 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Estimation and scheduling of future pavement maintenance and rehabilitation (M&R) works are one of the primary concerns of highway agencies due to the limited allocations in budget and resources. Two approximate methods for estimation of pavement rehabilitation cost are presented and compared in this study based on highway present condition index (HPCI) and rehabilitation history. The former is based on pavement condition, while the latter is based on historical and statistical trends. Database from a pavement management system (PMS) of various highway sections surveyed in Korea were used in this study to establish a relationship between HPCI and pavement service life and to analyse the trends of rehabilitation periods. The two simple methods presented provide useful information and probable range for the various highway agencies to guide them in the preliminary planning, budgeting, estimating and scheduling of their future pavement M&R works.

Key concepts: Pavement management, Rehabilitation, Transport engineering, Scheduling (production processes), Estimation, Pavement engineering, Service life, Driver rehabilitation

Related papers

Back to paper searchBrowse research topicsOriginal source
Estimation of pavement rehabilitation cost using pavement management data — Research Paper | ScholarLens