2006•Unpublished venueRequires access

Phasor Measurements in the Western Electric Power System

K.E. Martin

Open publisher page 1 citations

Abstract

This paper presents the use of phasor measurement units (PMUs) in the Western Electric Coordinating Council (WECC) has been very successful. Phasor data recorded during the Aug. 10, 1996 blackout showed the phase difference growing as the system weakened well before system separation. It also showed clearly the dynamic system behavior before and during the blackout. WAMS measurements, particularly phasor measurements, filled the need to see system behavior that other measurements did not cover. Phasor measurements are now widely dispersed in the WECC, most of the in real-time systems. More of these are being connected in wide-area networks to support continuing efforts to improve operations

About this research paper

What this paper is about

This paper presents the use of phasor measurement units (PMUs) in the Western Electric Coordinating Council (WECC) has been very successful. Phasor data recorded during the Aug. 10, 1996 blackout showed the phase difference growing as the system weakened well before system separation. It also showed clearly the dynamic system behavior before and during the blackout. WAMS measurements, particularly phasor measurements, filled the need to see system behavior that other measurements did not cover. Phasor measurements are now widely dispersed in the WECC, most of the in real-time systems. More of these are being connected in wide-area networks to support continuing efforts to improve operations

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper presents the use of phasor measurement units (PMUs) in the Western Electric Coordinating Council (WECC) has been very successful. Phasor data recorded during the Aug. 10, 1996 blackout showed the phase difference growing as the system weakened well before system separation. It also showed clearly the dynamic system behavior before and during the blackout. WAMS measurements, particularly phasor measurements, filled the need to see system behavior that other measurements did not cover. Phasor measurements are now widely dispersed in the WECC, most of the in real-time systems. More of these are being connected in wide-area networks to support continuing efforts to improve operations

Key concepts: Phasor, Blackout, Units of measurement, Electric power system, Computer science, Electrical engineering, Power (physics), Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Phasor Measurements in the Western Electric Power System — Research Paper | ScholarLens