Investigation on Circulating Path of Injected Water for High Water-Cut Oilfield
Sui Ting Zhao, Qi Li, Xiao Ru He, Kao Ping Song, Ji Cheng Zhang
Abstract
Sui Ting Zhao, Qi Li, Xiao Ru He, Kao Ping Song, Ji Cheng Zhang
Abstract
In this paper, the indexes have been determined for identifying ineffective injection-production circulation and corresponding mathematical model was constructed with fuzzy theory. Application examples show that this method is simple, fast and accurate. For high and extra-high water cut oilfields, because of the long-term erosion of injected water, there are some high penetrative channels between the injection and production wells, resulting in most injected water along the channel to cause the invalid injection and production, for which it is hard to increase water flooding swept volume, causing flooding and high water cut well and reducing oil production. To improve the effectiveness of water injection to achieve stable yields, it is important to take the measures of ineffective injection-production wells profile control, plugging and so on for fast and accurate identifying ineffective injection-production wells. To that end, this paper applied fuzzy theory to establishing the mathematical model for identifying ineffective injection-production wells.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In this paper, the indexes have been determined for identifying ineffective injection-production circulation and corresponding mathematical model was constructed with fuzzy theory. Application examples show that this method is simple, fast and accurate. For high and extra-high water cut oilfields, because of the long-term erosion of injected water, there are some high penetrative channels between the injection and production wells, resulting in most injected water along the channel to cause the invalid injection and production, for which it is hard to increase water flooding swept volume, causing flooding and high water cut well and reducing oil production. To improve the effectiveness of water injection to achieve stable yields, it is important to take the measures of ineffective injection-production wells profile control, plugging and so on for fast and accurate identifying ineffective injection-production wells. To that end, this paper applied fuzzy theory to establishing the mathematical model for identifying ineffective injection-production wells.
Key concepts: Water cut, Petroleum engineering, Water injection (oil production), Water flooding, Oil production, Injection well, Flooding (psychology), Production (economics)